Tekezé Dam is a double-curvature arch dam located on the border of Amhara and Tigray region of Ethiopia. It is situated on the Tekezé River, a tributary of the Nile that flows through one of the deepest canyons in the world.

Tekeze Dam
Tekeze Reservoir, seen from the dam
Location of Tekeze Dam in Ethiopia
Official nameTekeze Dam
CountryEthiopia
LocationTigray, Ethiopia
Coordinates13°20′49″N 38°44′37″E
StatusOperational
Construction began1999
Opening dateFebruary 2009
Construction cost$360 million
Owner(s)Ethiopian Electric Power
Dam and spillways
Type of damArch dam
ImpoundsTekeze River
Height607 ft (185 m)
Length2,329 ft (710 m)
Reservoir
Total capacity9.0 km3 (7,300,000 acre⋅ft)
Power Station
Turbines4 x 75 MW (101,000 hp)
Installed capacity300 MW (400,000 hp)

Overview

CWGS was contracted to build the Tekezé Dam. The hydroelectric project was completed in February 2009. Its final cost was $360 million, which was $136 million over budget. The dam was Ethiopia's largest public works project.[1] The dam helped to reduce power shortages as Ethiopia's power demand increases.

At the time of its completion, the 188 metres (617 ft) Tekezé Dam was Africa's largest double-curvature arch dam.[2]

Tekeze Power Station

The powerhouse contains four 75 MW (101,000 hp) turbines,[2] generating 300 MW (400,000 hp) of electricity. A 105 kilometres (65 mi) transmission line connects it to the national grid at Mekelle.[2]

See also

References

  1. "Tekeze project inaugurated in Ethiopia". International Water Power & Dam Construction. 17 November 2009. Retrieved 26 May 2014.
  2. "Hydro power in Ethiopia - the staged construction of Tekeze Arch Dam". International Water Power & Dam Construction. 11 May 2009. Retrieved 26 May 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.