Mesgi'g Ugju's'n Wind Farm

The Mesgi'g Ugju's'n (MU) Wind Farm, "big wind" in Mi'gmaq is a 149.25 megawatt (MW) wind farm currently under construction. The MU wind farm is expected to produce enough electricity to power approximately 30,000 homes.[2] The wind project is owned and developed in a 50-50 partnership between the three Mi’gmaq First Nations (Listuguj, Gesgapegiag, Gespeg) and Innergex Renewable Energy.[3][4]

Mesgi'g Ugju's'n Wind Farm
CountryCanada
Coordinates48°13′05″N 66°42′26″W
StatusOperational
Construction beganJune 22, 2015
Commission date2017
Construction cost$330,000,000 (2013)
Owner(s)Parc éolien Mesgi'g Ugju's'n (MU) S.E.C
Wind farm
Hub height100 m
Rotor diameter114 m
Rated wind speed12 m/s
Site area25,863 ha
Power generation
Units operational47
Make and modelSenvion 3.2M114[1]
Nameplate capacity149.25 MW
External links
Websitewww.muwindfarm.com

The wind farm became operational in 2017.

See also

References

  1. "A page of history was turned: Quebec's first 3.2M114 wind turbine is built!". Retrieved 2016-06-29.
  2. "Senvion wins 150 Megawatt contract for Canadian wind farm" (PDF). Senvion. Archived from the original (PDF) on 14 July 2015. Retrieved 5 May 2015.
  3. "CHRONICLE 1 - Mesgi'g Ugju's'n" (PDF). innergex.com. Retrieved 4 June 2015.
  4. "Mesgi'g Ugju's'n". Innergex.com. Retrieved 4 June 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.