List of solar farms in Queensland

This is a list of solar farms in Queensland. There has been significant growth in this area recently, with an estimated 17298 MW of solar capacity either operational, planned or under construction.[1]

Table

Project name Sponsoring company Coordinates Capacity (MW) (AC) Status Notes
Daydream Solar Farm[2] Edify Energy 20.512°S 147.693°E / -20.512; 147.693 (Daydream) 167.5[3] Operating 180 MW DC capacity. Started Commercial Operations in August 2018. Originally developed by Solar Choice [4][5]
Sun Metals Solar Farm[6] Sun Metals 19.437°S 146.696°E / -19.437; 146.696 (Sun Metals) 124 Operating 124 MW AC capacity.[7] Started exporting to the grid in May 2018.[8]
Ross River Solar Farm[9] Palisade 19.425°S 146.716°E / -19.425; 146.716 (Ross River) 128 Operating Started exporting to the grid in September 2018.
Darling Downs Solar Farm APA Group 27.112°S 150.882°E / -27.112; 150.882 (Darling Downs) 110 Operating Started exporting to the grid in September 2018.
Clare Solar Farm[10] Fotowatio Renewable Ventures 19.840°S 147.211°E / -19.840; 147.211 (Clare) 100[10] Operating Started exporting to the grid in May 2018.[10]
Emerald Solar Park RES Group 23.508°S 148.128°E / -23.508; 148.128 (Emerald) 68 Operating Started exporting to the grid in October 2018.
Hamilton Solar Farm Wirsol and Edify Energy 20.469°S 147.799°E / -20.469; 147.799 (Hamilton) 57.5 Operating Started exporting to the grid in March 2018.[11]
Hayman Solar Farm Edify Energy 20.512°S 147.693°E / -20.512; 147.693 (Daydream) 50 Operating Started Commercial Operations in August 2018.[12]
Whitsunday Solar Farm Wirsol and Edify Energy 20.537°S 147.805°E / -20.537; 147.805 (Whitsunday) 57.5 Operating Started exporting to the grid in March 2018.[13]
Kidston Solar Project KS1 Genex 18.880°S 144.151°E / -18.880; 144.151 (Kidston 1) 50 Operating 50 MW Stage started exporting to the grid in November 2017.[14]
Kidston Solar Project KS2 Genex 18.884°S 144.124°E / -18.884; 144.124 (Kidston 2) 270 Announced EPBC Approval Pending 11 January 2019, Referral Number 2018/8229.[15]
Aldoga Solar Farm Acciona Australia 23.801°S 151.054°E / -23.801; 151.054 (Aldoga) 265 Approved Construction aims to start in early-mid 2020.[16] EPBC Approval 25 September 2018 (EPBC Referral 2018/8251)
Aramara Solar Farm 25.572°S 149.854°E / -25.572; 149.854 (Aramara) 140 Approved [17]
Baralaba Solar Farm Fotowatio Renewable Ventures 24.195°S 152.329°E / -24.195; 152.329 (Baralaba) 92 Announced [18]
Barunggam Solar Farm Ubergy 26.685°S 150.765°E / -26.685; 150.765 (Barunggam) 140 Announced Site location in cited article believed incorrect. Coordinates provided +/- 3km accuracy [19]
Beelbee Solar Farm APA Group 27.145°S 150.824°E / -27.145; 150.824 (Beelbee) 150+ Approved 150-240 MW Planned.[20]
Baking Board Solar Farm Impact Investment Group 26.723°S 150.553°E / -26.723; 150.553 (Baking Board) 19.9 Operating
Barcaldine RC Solar Farm Elecnor 23.547°S 145.318°E / -23.547; 145.318 (Barcaldine) 20 Operating A further 40 MW proposed[21]
Blackwater Solar Farm Blackwater Solar Farm Pty Ltd 23.597°S 148.753°E / -23.597; 148.753 (Blackwater) 150 Approved Approved 11 Aug 2017[22]
Blair Athol Solar Power Station TerraCom Limited 22.691°S 147.542°E / -22.691; 147.542 (Blair Athol) 60 Announced [23]
Blue Grass Solar Farm X-Elio Australia Pty Ltd 26.680°S 150.493°E / -26.680; 150.493 (Blue Grass) 102 Approved Decision Notice Nov 2018[24]
Bluewater Solar Farm Fotowatio Renewable Ventures 19.145°S 146.485°E / -19.145; 146.485 (Bluewater) 148 Announced EPBC Approval Obtained[25]<
Bluff Solar Farm Infigen Energy 23.598°S 149.039°E / -23.598; 149.039 (Bluff) 260 Announced [26][27]
Bouldercombe Solar Farm Eco Energy World 23.525°S 150.499°E / -23.525; 150.499 (Bouldercombe) 280 Approved [28]
Bowen Solar Farm Infigen Energy 20.076°S 148.216°E / -20.076; 148.216 (Bowen) 100 Announced [29]EPBC Referral reference 2017/8123 pending approvals 2 Nov 2018
Brigalow Solar Farm Impact Investment Group 27.690°S 151.564°E / -27.690; 151.564 (Brigalow) 34.5 Approved [30]
Broadlea Solar Farm Eco Energy World 21.862°S 148.170°E / -21.862; 148.170 (Broadlea) 100 Approved [31]
Bucca Solar Farm PB Enertec Pry Ltd 24.939°S 152.080°E / -24.939; 152.080 (Bucca) 108.8 Approved Approved 21 Dec 2018 PD on Line Reference Number 522.2018.108.1[32]
Bulli Creek Solar Farm Solar Choice and SunEdison 28.021°S 150.878°E / -28.021; 150.878 (Bulli Creek) 1200[33] Approved [34]
Bullyard Solar Farm EIWA Solar Bundaberg Pry Ltd 24.938°S 152.015°E / -24.938; 152.015 (Bullyard) 92 Approved Approved 8 Nov 2018 PD on Line Reference Number 522.2018.70.1[35]
Burdekin Solar Farm Cleangen 19.880°S 147.165°E / -19.880; 147.165 (Burdikin) 140 Approved Approved[36]
Cameby Solar Farm X-Elio 26.682°S 150.510°E / -26.682; 150.510 (Cameby) 148 Approved Approved Nov 2018 [37]
Cape York Solar Storage Lyon Group 15.898°S 144.857°E / -15.898; 144.857 (Cape York) 55 Approved Approved July 2017 [38]
Chewco Solar Energy Farm Tilt Renewables 17.047°S 145.384°E / -17.047; 145.384 (Chewco) 75 Announced Fact Sheet August 2017[39]
Childers Solar Farm Elliot Green Power 25.303°S 152.403°E / -25.303; 152.403 (Childers) 75 Operating Started exporting to the grid in March 2019.[40][41]
Childers DDN Green Solar Farm DDN Green 24.923°S 152.294°E / -24.923; 152.294 (Childers DDN) 42 Announced Development Application lodged 23 October 2018 PD on Line Reference Number 522.2017.88.1[42]
Chinchilla Solar Farm First Solar 26.670°S 150.793°E / -26.670; 150.793 (Chinchilla) 100 Approved [43]
Clarke Creek Wind and Solar Farm Lacour Energy 22.656°S 149.347°E / -22.656; 149.347 (Clarke Creek W&S) 400 Approved [44][45]
Clermont Solar Farm Wirsol 22.839°S 147.581°E / -22.839; 147.581 (Clermont) 75 Operating Started exporting to the grid in June 2019.[46][47]
Cloncurry (Solarvoltaic) Solar Farm Infigen Energy 20.706°S 140.509°E / -20.706; 140.509 (Cloncurry) 30 Announced [48]<
Collinsville Solar PV Ratch Australia 20.538°S 147.807°E / -20.538; 147.807 (Collinsville) 42.5 Operating [49]
Comet Solar Farm Hadstone Energy /Comet Solar Farm Pty Ltd 23.613°S 148.770°E / -23.613; 148.770 (Comet) 235 Approved Due to commission on 30 November 2018.[50][51]
Columboola Solar Farm Luminous Energy 26.636°S 150.296°E / -26.636; 150.296 (Columboola) 310 Approved [52]
Crinum Creek Solar Farm Adani 23.031°S 148.340°E / -23.031; 148.340 (Crinum Creek) 100 Announced GMUSG-SACOME-Conference Aug 2016 [53]
Dalby Solar Farm RES RES 27.208°S 151.308°E / -27.208; 151.308 (Dalby RES) 22 Approved [54]
Daystar Energy Solar Farm Daystar Energy 26.643°S 150.290°E / -26.643; 150.290 (Daystar) 100 Approved Decision Notice Oct 18 [55]
Delga Solar Farm Shell 26.274°S 149.749°E / -26.274; 149.749 (Delga Park) 250 Approved [56]
Desailly Renewable Energy Park DP Energy 16.488°S 145.384°E / -16.488; 145.384 (Desailly) 250 Announced Development Application Lodged[57]project web site[58]
Dingo Solar Farm ESCO Pacific 23.634°S 149.383°E / -23.634; 149.383 (Dingo) 85 Announced [59]
Dunblane Solar Farm YD Projects 23.542°S 145.201°E / -23.542; 145.201 (Dunblane) 11 Operating [60]
Dysart Solar Energy Farm Tilt Renewables 22.579°S 148.368°E / -22.579; 148.368 (Dysart) 150 Approved [61][62] Project Approval[63]
Dysart Solar Farm Hanwha 22.514°S 148.504°E / -22.514; 148.504 (Dysart Hanwha) 130 Announced
Edenvale Solar Farm Edenvale Solar Park Pty Ltd 26.932°S 150.583°E / -26.932; 150.583 (Edenvale) 280 Approved [64]
Ewerleigh Solar Farm Everleigh Solar Park Pty Ltd 26.913°S 150.586°E / -26.913; 150.586 (Ewerleigh) 150 Approved [64] Decision Notice[65] Project and Owner name are correct
Gooburrum Solar Farm PB Enertec Pry Ltd 24.807°S 152.319°E / -24.807; 152.319 (Gooburrum) 4 Approved Approved 15 Dec 2017 PD on Line Reference Number 522.2017.26.1[66]
Gregory Solar Farm Engie Renewables Australia 23.143°S 148.447°E / -23.143; 148.447 (Gregory) 215 Approved [67]
Gumlu Solar Farm RJ Gordon Solar Consultants 19.871°S 147.668°E / -19.871; 147.668 (Gumlu) 60 Announced [68]
Gympie Regional Energy Hub SolarQ 26.094°S 152.443°E / -26.094; 152.443 (Gympie) 350 Approved 350 MW approved, 1000 MW additional in planning.[69]
Harlin Solar Farm Sunshine Energy 26.948°S 152.410°E / -26.948; 152.410 (Harlin) 1500 Under construction Construction began in February 2019. There are plans to add a 500MWh battery storage facility.[70][71]
Haughton Solar Farm Pacific Hydro 19.731°S 147.073°E / -19.731; 147.073 (Haughton) 100 Operating First 100 MW Stage began exporting to the grid in June 2019.[72][73]It is believed the other stages have not begun construction.[74][75]
Hughenden Sun Farm Lighthouse Solar 20.854°S 144.186°E / -20.854; 144.186 (Hughenden) 22.5 Operating Construction started in September 2017 and production commenced in September 2018.[76]
Kelsey Creek Solar Farm KCSF Consortium 20.449°S 148.539°E / -20.449; 148.539 (Kelsey Creek) 50 Announced [77]
Kennedy Energy Park Windlab / Eurus 20.935°S 144.315°E / -20.935; 144.315 (Kennedy) 15 Under construction First 15 MW stage commenced. Further 650 MW stage has not begun as of November 2018.[78]
Kingaroy Solar Farm Terrain Energy 19.826°S 147.527°E / -19.826; 147.527 (Kingaroy) 40 Announced Development approval refused 23 Nov 2018, appeal lodged against Council decision and pending[79]
Koberinga Solar Farm ESCO Pacific 19.826°S 147.527°E / -19.826; 147.527 (Koberinga) 55 Announced [80]
Lakeland Solar Farm Conergy Australia 15.868°S 144.862°E / -15.868; 144.862 (Lakeland) 26 Operating [81]
Lilyvale Solar Farm Fotowatio Renewable Ventures 23.070°S 148.423°E / -23.070; 148.423 (Lilyvale) 100 Operating Started exporting to the grid in March 2019.[82][83]
Longreach Solar Farm Canadian Solar 23.447°S 144.358°E / -23.447; 144.358 (Longreach) 15 Operating [84]
Majors Creek Solar Farm Edify 19.582°S 146.862°E / -19.582; 146.862 (Majors Creek) 200 Announced EPBC Approval 20 July 2017 EPBC Reference 2017/7963[85]Town planning report[86]
Mareeba Solar Farm CleanGen 16.000°S 145.400°E / -16.000; 145.400 (Mareeba) 60 Approved [87]
Middlemount Solar Farm Overland 22.824°S 148.723°E / -22.824; 148.723 (Middlemont) 28 Under construction [88]
Mirani Solar Farm ESCO Pacific 21.146°S 148.830°E / -21.146; 148.830 (Mirani) 60 Approved [89]
Moura Solar Farm ESCO Pacific 24.514°S 150.084°E / -24.514; 150.084 (Moura) 110 Announced [90]
Munna Creek Solar Farm Renewable Energy System Technologies 25.892°S 152.469°E / -25.892; 152.469 (Munna Creek) 120 Approved [91]
Normanton Solar Farm Scouller Energy 17.681°S 141.050°E / -17.681; 141.050 (Normanton) 5 Operating [92]
Oakdene Solar Farm juwi 26.710°S 150.725°E / -26.710; 150.725 (Oakdene) 100 Announced [93] Development approval subject to appeal Mar 2019
Oakey Solar Farm Canadian Solar Australia / RE Oakey 27.758°S 151.648°E / -27.758; 151.648 (Oakey) 25 Operating Oakey 1 (25MW) started exporting to the grid in March 2019. [94]

Oakey 2 (55MW) has not started exporting to the grid as of July 2019. [95]

Paget Solar Farm BOMA Group 21.190°S 149.165°E / -21.190; 149.165 (Paget) 20 Announced [96]
Qunaba Solar Farm PB Enertec Pry Ltd 24.901°S 152.436°E / -24.901; 152.436 (Qunaba) 77 Approved Approved 21 Dec 2018 PD on Line Reference Number 522.2018.113.1[97]
Raglan Solar Farm Eco Energy World 23.758°S 150.850°E / -23.758; 150.850 (Raglan) 350 Approved [98]
Rodds Bay Solar Farm Renew Estate 24.189°S 151.585°E / -24.189; 151.585 (Rodds Bay) 250[99] Approved [100]
Rolleston Solar Farm RES Group 24.396°S 148.473°E / -24.396; 148.473 (Rolleston) 90 Approved [101]
Rollingstone Solar Farm ESCO Pacific 19.013°S 146.407°E / -19.013; 146.407 (Rollingstone) 110 Approved [102]
Rugby Run Solar Farm Adani Australia 22.084°S 147.870°E / -22.084; 147.870 (Rugby Run) 65 Operating Started exporting to the grid in May 2019.[103][104]
Susan River Solar Farm Elliot Green Power 25.417°S 152.744°E / -25.417; 152.744 (Susan River) 100 Operating Started exporting to the grid in December 2018.[105] Officially opened in February 2019.[106][107]
Sunshine Coast Solar Farm Sunshine Coast Regional Council 26.560°S 153.026°E / -26.560; 153.026 (Sunshine Coast) 15 Operating [108]
Tieri Solar Farm Fotowatio Renewable Ventures 23.096°S 148.045°E / -23.096; 148.045 (Tieri) 96 Approved ref>"Tieri Solar Farm". reneweconomy.com.au. Retrieved 2019-01-23.</ref>
Wandoan Solar Project Equis 26.248°S 149.764°E / -26.248; 149.764 (Wandoan) 1000 Approved [109]
Warhook Solar Project Engie Renewables Australia 26.612°S 150.259°E / -26.612; 150.259 (Warhook) 200 Approved [110][111]
Warwick Solar Farm University of Queensland 28.189°S 152.060°E / -28.189; 152.060 (Warwick) 64 Under construction Construction started in April 2019.[112][113]
Western Downs Green Power Hub Neoen 26.955°S 150.677°E / -26.955; 150.677 (WDGPH) 390[114] Approved 390MWac facility. Proposed to be paired with 580MWh of battery storage.[115][116]
Western Downs Solar Farm Tilt Renewables 26.937°S 150.707°E / -26.937; 150.707 (Western Downs) 250 Announced [117]
Woolooga Energy Park LGI Limited 26.076°S 152.487°E / -26.076; 152.487 (Wooloolga) 185 Announced [118]
Yarranlea Solar Farm Risen 27.7074°S 151.527°E / -27.7074; 151.527 (Yarranlea) 100 Operating Construction started 23 July 2018[119]

Summary of capacity

Status Capacity (MW)
Operating 1609.5
Under construction 1726.9
Approved 7904.3
Announced 2852
Total 14092.7


References

  1. "Electricity generation map". maps.dnrm.qld.gov.au. Queensland Department of Energy and Water Supply. Retrieved 2018-11-26.
  2. "Daydream Solar Farm". Edify Energy. Retrieved 2018-11-13.
  3. "Wayback Machine". web.archive.org. Retrieved 2018-11-26.Archive index at the Wayback Machine
  4. https://www.solarchoice.net.au/blog/whitsunday-solar-farm-hub-helicopter-flyover-video-photos/
  5. "Daydream Solar Farm". Edify Energy. Retrieved 2018-11-26.
  6. "Queensland's biggest solar farm starts generating to grid". RenewEconomy. 2018-05-31. Retrieved 2018-07-27.
  7. "Sun Metals Solar Farm". Archived from the original on 2018-07-27. Retrieved 2018-11-26.
  8. "Queensland's biggest solar farm starts generating to grid". RenewEconomy. 2018-05-31. Retrieved 2018-11-26.
  9. "The Project". Ross River Solar Farm. Retrieved 2018-09-27.
  10. "Renewables flow for Queensland". pv magazine Australia. Retrieved 2018-06-13.
  11. "Hamilton Solar Farm". Edify Energy. Retrieved 2018-11-26.
  12. "Hayman Solar Farm". Edify Energy. Retrieved 2018-11-26.
  13. "Whitsunday Solar Farm". Edify Energy. Retrieved 2018-11-26.
  14. "50 MW Kidston Solar Project". Genex Power Limited. Retrieved 2018-11-26. no-break space character in |title= at position 3 (help)
  15. "50 MW Kidston Solar Project". EPBC. Retrieved 2019-01-11. no-break space character in |title= at position 3 (help)
  16. "Aldoga Solar Farm". www.acciona.com.au. Retrieved 2018-11-27.
  17. "Aramara Solar Farm". AltEnergy. Retrieved 2018-11-27.
  18. "Home - FRV Baralaba Farm". FRV Baralaba Farm. Retrieved 2018-11-27.
  19. "Alt energy project update" (PDF). AltEnergy. Retrieved 2019-01-18.
  20. "Beelbee Solar Farm". AltEnergy. Retrieved 2018-11-27.
  21. "Barcaldine Remote Community Solar Farm" (PDF). Elecnor Australia. Retrieved 2019-01-21.
  22. "ECHDC Development Register" (PDF). CHRC. Retrieved 2019-01-21.
  23. "Blair Athol – 60 MW Solar Power Station Plans" (PDF). Retrieved 27 November 2018. no-break space character in |title= at position 17 (help)
  24. "WRRC Decision Notice" (PDF). Retrieved 17 January 2019.
  25. "EPBC Approval". Retrieved 10 January 2019.
  26. "Bluff Solar Farm". AltEnergy. Retrieved 2018-11-27.
  27. "Bluff Solar Farm" (PDF) (Planning Report (Final)). Retrieved 2019-01-16.
  28. "Bouldercombe Solar Farm". AltEnergy. Retrieved 2018-11-29.
  29. "Bowen Solar Farm". AltEnergy. Retrieved 2018-11-29.
  30. "Brigalow Solar Farm". Impact. Retrieved 2019-01-18.
  31. "Broadlea Solar Farm". AltEnergy. Retrieved 2018-11-29.
  32. "PD On line". BRC. Retrieved 2019-01-21.
  33. "Projects". www.firstsolar.com. Retrieved 2019-07-19.
  34. "Bulli Creek Solar Farm". POWER PLANTS. Retrieved 2018-11-29.
  35. "PD On line". BRC. Retrieved 2019-01-21.
  36. "Burdekin solar project approved". CleanGen. Retrieved 2019-01-21.
  37. "WDRC Press Release". WDRC. Retrieved 2019-01-18.
  38. "Cape York Solar Storage - Lyon Group". Lyon Group. Retrieved 2018-11-30.
  39. "Chewko Solar Energy Farm Fact Sheet" (PDF). Static1. August 2017. Archived from the original (PDF) on 2019-01-23. Retrieved 2019-01-23.
  40. "Solar Energy in Australia | March 2019 | Aneroid". anero.id. Retrieved 2019-06-30.
  41. "Childers Solar Farm". AltEnergy. Retrieved 2018-11-30.
  42. "PD On line". BRC. Retrieved 2019-01-21.
  43. "Projects". www.firstsolar.com. Retrieved 2018-11-30.
  44. "Contractor and Employment Register". Clarke Creek Wind and Solar Farm. Retrieved 2018-11-30.
  45. "Isaac Regional Council". IRC. Retrieved 2019-01-16.
  46. "Solar Energy in Australia | June 2019 | Aneroid". anero.id. Retrieved 2019-06-30.
  47. "Clermont Solar Farm". WIRSOL. 2018-03-08. Retrieved 2018-11-30.
  48. "Development Pipeline". infigenenergy.com. Retrieved 2019-01-23.
  49. "Collinsville North Solar Farm". AltEnergy. Retrieved 2018-11-30.
  50. "Comet Solar Farm". POWER PLANTS. Retrieved 2018-11-30.
  51. "Hadstone's 309 MWp "Comet" Solar Farm approved in Queensland". www.linkedin.com. Retrieved 2018-11-30.
  52. "Columboola Solar Farm". AltEnergy. Retrieved 2018-11-30.
  53. "Adani presentation" (PDF). wcci. wcci. Retrieved 2019-01-23.
  54. "RES Group". RES. RES. Retrieved 2019-01-21.
  55. "Decision Notice" (PDF). WDRC. WDRC. Retrieved 2019-01-17.
  56. "Delga Solar Farm". AltEnergy. Retrieved 2018-11-30.
  57. "Desailly Renewable Energy Park" (PDF). MSC. Retrieved 2019-01-23.
  58. "Desailly Solar Queensland". DP Energy. Retrieved 2019-01-23.
  59. "Dingo Solar Farm". dingosolarfarm.com.au. Retrieved 2018-11-30.
  60. "New 11MW solar farm sets new benchmarks in Queensland". RenewEconomy. Retrieved 2019-01-21.
  61. "Dysart Solar Farm". Tilt Renewables. Retrieved 2018-11-30.
  62. "Dysart Solar Farm". AltEnergy. Retrieved 2018-11-30.
  63. "Notice about decision - Statement of reasons" (PDF). IRC. Isaac Regional Council. 20 December 2017. Retrieved 2019-01-16.
  64. "Press Release WDRC". WDRC. Retrieved 2018-11-30.
  65. "Decision Notice" (PDF). WDRC. Retrieved 2019-01-17.
  66. "PD On line". BRC. Retrieved 2019-01-21.
  67. "Gregory Solar Farm". AltEnergy. Retrieved 2019-01-10.
  68. "Gumlu solar farm proposal". North Queensland Register. Retrieved 2019-01-23.
  69. "SQ1 GREH – Gympie Regional Energy Hub – Lower Wonga". SolarQ. Retrieved 2018-11-30.
  70. "1.5 GW solar, 500 MWh battery project breaks ground in Queensland". pv magazine Australia. Retrieved 2019-07-19.
  71. "Sunshine Energy Projects". Sunshine Energy. Retrieved 2019-01-18.
  72. "Solar Energy in Australia | June 2019 | Aneroid". anero.id. Retrieved 2019-06-30.
  73. "Haughton solar farm". Pacific Hydro. Retrieved 2018-11-30.
  74. "Haughton Solar Farm Project" (PDF). Retrieved 1 July 2019.
  75. Parkinson, Giles (2019-05-29). "Two new solar farms connect to the grid in Queensland". RenewEconomy. Retrieved 2019-06-30.
  76. "Hughenden Sun Farm". POWER PLANTS. Retrieved 2018-11-30.
  77. "Technology". www.kcsf.com.au. Retrieved 2018-11-30.
  78. "Kennedy Energy Park". kennedyenergypark.com.au. Retrieved 2018-11-30.
  79. "Northern Star". northernstar.com.au. Retrieved 2019-01-18.
  80. "Koberinga Solar Farm". koberingasolarfarm.com.au. Retrieved 2018-11-30.
  81. "Lakeland Solar Farm". POWER PLANTS. Retrieved 2018-11-30.
  82. Parkinson, Giles (2019-03-12). "Lilyvale is latest large scale solar farm to begin production in Queensland". RenewEconomy. Retrieved 2019-06-30.
  83. "Home - Lilyvale Solar Farm". Lilyvale Solar Farm. Retrieved 2018-11-30.
  84. "longreach solar farm". longreach solar farm. Retrieved 2019-01-21.
  85. "EPBC Referral List". epbc. Retrieved 2019-01-23.
  86. "TCC DA" (PDF). TCC. Retrieved 2019-01-23.
  87. "Mareeba Secures permit". cleangen.com.au. Retrieved 2019-01-21.
  88. "Middlemont Sun Farm". overlandsunfarming.com.au. Retrieved 2019-01-21.
  89. "Mirani Solar Farm". miranisolarfarm.com.au. Retrieved 2018-11-30.
  90. "Moura Solar Farm". mourasolarfarm.com.au. Retrieved 2019-01-21.
  91. "Munna Creek Solar Farm". POWER PLANTS. Retrieved 2018-11-30.
  92. "Normanton Solar Farm". normantonsolarfarm. Retrieved 2019-01-21.
  93. "Council Meeting Minutes". WDRC. Retrieved 2019-03-26.
  94. Parkinson, Giles (2019-03-15). "Oakey solar farm begins production, second new plant in a week in Queensland". RenewEconomy. Retrieved 2019-06-30.
  95. "OAKEY". oakeysolarfarm.com.au. Retrieved 2018-11-30.
  96. "Daily Mercury". dailymercury.com.au. Retrieved 2019-01-23.
  97. "PD On line". BRC. Retrieved 2019-01-21.
  98. "Raglan Solar Farm". AltEnergy. Retrieved 2018-11-30.
  99. "Rodds Bay Solar Farm". WIRSOL. 2018-03-08. Retrieved 2019-07-19.
  100. "Rodds Bay Solar Farm". www.roddsbaysolarfarm.com. Retrieved 2019-01-21.
  101. "Project Summary". Rolleston Solar Farm. Retrieved 2018-11-30.
  102. "Rollingstone Solar Farm". rollingstonesolarfarm.com.au. Retrieved 2018-11-30.
  103. Parkinson, Giles (2019-05-29). "Two new solar farms connect to the grid in Queensland". RenewEconomy. Retrieved 2019-06-30.
  104. "Adani Australia". www.adaniaustralia.com. Retrieved 2018-11-30.
  105. "Solar Energy in Australia | December 2018 | Aneroid". anero.id. Retrieved 2019-06-30.
  106. Parkinson, Giles (2019-02-05). "Elliott Green Power opens Susan River solar farm, two more being built". RenewEconomy. Retrieved 2019-06-30.
  107. "Susan River Solar Farm". POWER PLANTS. Retrieved 2018-11-30.
  108. "Solar Farm overview". scrc. Retrieved 2019-01-23.
  109. "Wandoan Solar Project". WDRC decision notice. Retrieved 2019-01-10.
  110. "Warhook Solar Project" (PDF). WDRC decision notice. Retrieved 2019-01-10.
  111. "Warhook Solar Farm". ENGIE Australia and New Zealand. Retrieved 2019-07-19.
  112. Vorrath, Sophie (2019-04-18). "Work begins on Warwick solar farm – UQ's ticket to 100% renewables". RenewEconomy. Retrieved 2019-07-01.
  113. "Warwick Solar Farm". UQ. Retrieved 2019-01-18.
  114. webk. "Western Downs Green Power hub". Retrieved 2019-07-19.
  115. "Western Downs Green Power Hub". AltEnergy. Retrieved 2018-11-30.
  116. "Western Downs Green Power hub". westerndownsgreenpowerhub.com.au. Retrieved 2018-11-30.
  117. "Western Downs Solar Farm". Tilt Renewables. Retrieved 2018-11-30.
  118. "Home". Woolooga Energy Park. Retrieved 2018-11-30.
  119. "Home". Yarranlea. Retrieved 2019-01-18.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.