Line 3 (Rio de Janeiro)

Line 3 is a planned line of the Rio de Janeiro Metro.

Line 3 Rio de Janeiro
Overview
TypeRapid transit
SystemRio de Janeiro Metro
StatusPostponed
LocaleRio de Janeiro, Brazil
Niterói, Brazil
TerminiCarioca Station
Visconde de Itaboraí
Stations16
Operation
Planned openingUnknown
Technical
Line length37 kilometres (23 mi)

Background

In 2011, the Brazilian Ministry of Works announced that construction on the line would begin that year for a 2014 opening.[1] The line would feature an existing 23 kilometres (14 mi) suburban rail alignment in Niterói, São Gonçalo and Itaboraí being upgraded to metro standard, and a 4 kilometres (2.5 mi) tunnel under Guanabara Bay to Rio de Janeiro. [2]

References

  1. "Work set to begin on Rio de Janeiro Line 3". Metro Report. 2 November 2011. Retrieved 6 August 2019.
  2. "Brazil to begin construction on Rio de Janeiro metro Line 3 by end of the year". Metro Report. 6 November 2011. Retrieved 6 August 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.