IFA-2 (also Interconnexion France-Angleterre 2) is an electric interconnector cable currently (2019) under construction between France and the United Kingdom.[1]
IFA-2 | |
---|---|
Location | |
Country | France, United Kingdom |
General direction | south-north |
From | Tourbe, France |
Passes through | English Channel |
To | Warsash, United Kingdom |
Ownership information | |
Partners | National Grid plc Réseau de Transport d'Électricité |
Construction information | |
Manufacturer of conductor/cable | Prysmian Group |
Manufacturer of substations | ABB Group |
Construction started | 2017 |
Expected | 2020 |
Technical information | |
Type | submarine cable |
Type of current | HVDC |
Total length | 204 km (127 mi) |
Power rating | 1,000 MW |
DC voltage | ±320 kV |
No. of poles | 2 |
No. of circuits | 1 |
Specification
The HVDC cable will be 204-kilometre (127 mi) long, operating at +/-320kV, and with a capacity to transmit 1,000 MW of power.[2] It will be the second interconnector between France and Great Britain, after the HVDC Cross-Channel link.
Project partners
The project is being developed by IFA2 SAS, a joint venture between UK National Grid and RTE of France. [2]
Route
The cable will be connected to the French grid at the Tourbe 400 kV substation. From there, a 300 m high voltage alternating current (HVAC) underground cable would run to the converter station nearby. From the converter station a 24-kilometre (15 mi) long underground HVDC cable would run to landfall point at the east of Merville-Franceville-Plage, near Caen in Normandy.
On the British side the landfall point is located at Monks Hill Beach, at the southern end of Solent Airfield, near Southampton. The converter station would be located to the north east of Solent Airfield. From there a 2-kilometre (1.2 mi) long underground HVAC cable would run to the point of connection to the grid at Chilling 400 kV substation, near Warsash, Hampshire.[1]
Project history
In 2015, the European Commission identified IFA-2 as one of key energy infrastructure projects.[1]
In 2017, contract for IFA-2 was awarded to the Prysmian Group and ABB. [2]
Current status and future plans
In October 2019, the project completed the external construction of the UK convertor building. [4] Cable laying works in the eastern Solent took place at the end of 2019.[3]
The project p artners, National Grid and Réseau de Transport d'Electricité (RTE), are planning to complete the construction of IFA2 and start operations in 2020.[2]
References
- "IFA2 - Interconnextion France Angleterre". National Grid. Retrieved 2019-11-30.
- "Bridging UK and France with Electricity". Prysmian Group. Retrieved 2019-11-30.
- Sherwood, G.A.F (29 October 2019). "IFA2 CABLE LAY AND BURIAL CAMPAIGN - EASTERN SOLENT". national archives. royal navy. Retrieved 14 May 2020.
- "IFA2 'Tops out' at Daedalus Airfield". ifa2interconnector.com. IFA2. 3 Oct 2020. Retrieved 20 April 2020.
See Also
- ElecLink, another 1,000 MW UK-France interconnector under construction