Henri Konan Bédié Bridge

Henri Konan Bédié Bridge, also known as the HKB Bridge or Third Bridge, is a road bridge and expressway linking the north and south of Abidjan. The 1.5 km (0.93 mi) viaduct crosses the Ébrié Lagoon connecting the districts of Cocody and Marcory.

Henri Konan Bédié Bridge
Panorama of the Henri Konan Bédié Bridge
Coordinates 5°19′19″N 3°58′50″W
LocaleAbidjan, Ivory Coast
Characteristics
DesignBox girder bridge
Total length1500 m
History
Opened2014 (2014)
Statistics
TollYes

Built, financed and operated as a Public-private partnership, the toll bridge is the third major road crossing of the Ebrié lagoon and was designed to reduce congestion on its two predecessors, the Houphouët-Boigny Bridge and the Charles de Gaulle Bridge, constructed in the 1950s and 1960s respectively.[1]

History

The bridge featured in development plans for Abidjan as far back as 1952. In 1997 the Ivorian government signed a concession agreement with a consortium headed by the Bouygues Group for the construction and operation of the bridge and associated expressway project. Due to political instability, major work on the project only got underway in 2011.[2]

References

  1. "Bouygues Construction Press Release" (PDF). www.bouygues-construction.com. Bouygues Construction. Retrieved 27 January 2015.
  2. "The Henri Konan Bédié Bridge, a masterpiece in the heart of Abidjan". www.afdb.org. African Development Bank. Retrieved 28 January 2015.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.