Dashgin Iskandarov

Dashgin Alamoghlu Iskandarov – General Manager of Production Union of State Oil Company of Azerbaijan Republic (SOCAR), PhD for technical sciences.

Dashgin Iskandarov
Born (1965-01-26) January 26, 1965
Shemakha, Azerbaijan SSR
NationalityAzerbaijani
Citizenship Azerbaijan
EducationAzerbaijan State University of Oil and Chemistry
Known forOil scientist
AwardsMerirt button badge of honorary title of “Honored Engineer”
Scientific career
InstitutionsAzneft Production Union
Doctoral advisorBaghir Suleymanov, professor, doctor of technical sciences

Biography

Dashgin Iskandarov was born in Azerbaijan's Shemakhi District in 1965. He did his military service from 1983–1985, and after completing his military service, he entered the department for development and complex mechanization of oil and gas fields of Azerbaijan Institute of Oil and Chemistry named M. Azizbayov (now Azerbaijan State University of Oil and Industry). Upon graduating from the institute in 1991, he was qualified as a mining engineer. Married, has two children.

Career

He started his career as oil and gas extraction operator on Deep Offshore Platform-5 of “28 of May” Oil and Gas Extraction Department (OGED) in 1991. He worked in the capacity of operator, engineer, deputy chief and then chief of Primary Gas Preparation and Transportation Facility up to 1999. From 1997–2007, he worked as a technician and then as a production supervisor in Azerbaijan International Operation Company and then in the control center of operations in BP Exploration Caspian Sea Limited company. He was appointed as first Deputy Chief and then Chief of “28 of May” Oil and Gas Extraction Department (OGED) of Azneft Production Union of SOCAR in 2007–2010. Iskandarov worked in the capacity of first Deputy Chief of General Manager of Azneft Production Union in 2010. He has been working as General Manager of Azneft Production Union since 2011.

Academic career

He defended PhD thesis with the theme of “Development and application of new procedures against the appeared complications in the reservoir- well system of offshore oil fields operated for longer period”, was awarded with PhD degree for technical sciences. He is the author of works “Reference Book for Oil and Gas Employees” and “Workover of Oil and Gas Wells” published in 2014 and 2015 correspondingly. The results of a number of scientific-research works, including the results of the tests carried out in the fields under his supervision and with his participation were published. He is the author of more than 15 scientific articles, including 2 books that are used as textbooks, 18 inventions and patents.

Scientific articles

  1. The method of removing lift pipes blocked with sand in 139.7 mm production pipelines with special gripping tools//ANT. – 2012. – No. 6. – pp. 24–29. (Coauthor: Y.A.İbrahimov).
  2. The improved method for conduction of cementing work under pressure in the wells having strong absorbing properties //ANT. – 2013. – No. 1. – pp. 29–34. (Coauthor: Y.A.İbrahimov).
  3. Hydrodynamic studies of flooded oil wells in settled mode - //Eco Energetics Scientific –Technical Journal. – 2013. - No. 2. (Coauthors: S.D.Mustafayev, R.A.Guliyev)
  4. The usage potentials of hydraulic power swivel while drilling the second wellbore //ANT. – 2013. – No. 3. – pp. 16–22. (Coauthor: Y.A.İbrahimov).
  5. The improved gripping tool for removing the lift pipes fallen into the well //ANT. – 2014. – No. 1. – pp. 32–36. (Coauthor Y.A.İbrahimov).
  6. Analysis of the operating parameters of oil field compressor units on the basis of flicker spectroscopy //Bulletin of Azerbaijan Engineering Academy. – 2014. – Volume 6. – No.1. – pp. 96–112. (Coauthor: A.N.Baghirov)
  7. Method of cementing the wells under pressure. Patent of the Republic of Azerbaijan İ 2014 0019, 07.04.2014. (Coauthor: Y.A.İbrahimov)
  8. Tool for removing the corroded lift pipes from the well. Patent of the Republic of Azerbaijan İ 2014 0020, 07.04.2014. (Coauthor: Y.A.İbrahimov)
  9. Interpretation methods of the results of stationary hydrodynamic analysis of flooded oil wells //SOCAR Proceedings. – 2014. - No. 3 . – pp. 52–57. (Coauthors: S.D. Mustafayev, R.A. Guliyev)
  10. Tool for removing the lift pipes blocked with sand from the well. Patent of the Republic of Azerbaijan İ 2014 0077, 04.11.2014. (Coauthor: Y.A.İbrahimov).
  11. Science, Technology and Higher Education. Materıals of the VI Internatıonal Research and Practıce Conference. Westwood, Canada, November 12 – 13 th 2014.
  12. Experimental-industrial implementation of complex method of drilling-in in complicated conditions. //SOCAR Proceedings. – 2014. - No. 4 . – pp. 29–34. (Coauthors: F.S. Ismayilov, R.D. Babayev, S.S. Huseynov)
  13. The reasons of pipeline sticking, procedures and methods for releasing it //ANT. – 2015. – No. 6. – pp. 25–34. (Cauthor: Y.A.İbrahimov).
  14. Well screen. Eurasian Patent No. 0244333, 2016. (Coauthors: F.S. Ismayilov, B.А.Suleymanov, S.P. Kazimov, O.T. Bagirov, A.C. Sheydayev, S.S. Huseynov)
  15. Well screen. Eurasian Patent No. 024517, 2016. (Coauthors: F.S. Ismayilov, B.А.Suleymanov, S.P. Kazimov, G.G. Ibadov, S.S. Huseynov, Е.K.Topelbergenov, М.I.Kurbanbaev)
  16. The reasons of pipeline sticking, procedures and methods for releasing it //ANT. – 2017. – No. 6. – pp. 25–33. (Coauthor: Y.A.İbrahimov).
  17. Characteristics of gripping work in production wells //ANT. – 2017. – No. 7-8. – pp. 56–62. (Coathor: Y.A.İbrahimov).
  18. Characteristics for implementation of gripping tools designed for emergency case during workover of production wells //ANT. – 2017. – No. 10. – pp. 24–29. (Coauthor: Y.Ə.İbrahimov).
  19. Gravity well screen of a new design. D.A. Iskandarov, G.G. Ibadov, E.K. Tolepbergenov //SOCAR Proceedings. – 2017. - No. 4 . – pp. 52–56
  20. Repair method of the well with defective area and with internal constriction of casing column and tool for its implementation. Eurasian Patent No. 027301, 2017. (Coauthors: F.S. Ismayilov, B.A. Suleymanov, A.A. Mamedov, Y.G. Davudov, F.T. Azimov, A.M. Valiyev, S.S. Huseynov.)
  21. Method of penetration into the producing reservoir. Eurasian Patent No. 026292, 2017. (Coauthors: F.S. Ismayilov, B.A. Suleymanov, B.A.Ibadov, G.G. Hajiyev, S.S. Huseynov.)
  22. Implementation of a gripping tool of a new design in repairing the pipeline ends of damaged production wells//ANT. – 2018. – No. 1. – pp. 29–34. (Coauthor: Y.A.İbrahimov).
  23. “Studies of the properties of gypsum-cement packing mixtures for preventing the absorption areas in the wells and methods of their delivery to the absorption area” //Oilfield engineering – 2018. The article is under review. (Coauthors: B.A. Agharahimov, Y.A. Ibrahimov)
  24. Sand blockages wash with magnetically activated sulphanole water //ANT. – 2018. - The article is under review. (Coauthor Arif Mammadzade)

Selected works

  • Reference Book for Oil and Gas Employees. Baku: 2014
  • Workover of Oil and Gas Wells. Baku: 2015

State awards and orders

  • In 2014 he was awarded with the honorary title of Honored Engineer under the corresponding decree of the President of the Republic of Azerbaijan.
  • On November 7, 2017, he was awarded with the “Labor Order of the 3rd degree” for his merits in the development of oil and gas industry, on the occasion of the production of the two billionth tons of oil from the oil fields in Azerbaijan with industrial methods.[1][2][3][4][5][6]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.