Azad Pattan Hydropower Project

{{Infobox dam | name = Azad Pattan Hydropower Project | name_official = | image = Azad Pattan HPP.png | image_size = | image_caption = Project Layout | location_map = Pakistan | location_map_size = | location_map_caption = | coordinates = 33°46′3.9″N 73°34′17.45″E | country = Pakistan | location = Sudhanoti District, Azad Kashmir | status = P | opening = 2026 | cost = $1.517 billion | owner = [CHINA GEZHOUBA GROUP CO., LTD, Laraib Group] | dam_type = Gravity dam, Run of the river | dam_height = 90 m (295 ft) | dam_height_thalweg = | dam_height_foundation = | dam_length = 80 m (262 ft) | dam_width_crest = | dam_width_base = | dam_volume = | dam_elevation_crest = | dam_crosses = Jhelum River | spillway_count = | spillway_type = | spillway_capacity = | plant_type = | plant_turbines = 4 x 160 MW | plant_capacity = 700  MW (10% continuous overload)[1] | plant_annual_gen = 3064 GWh | website = | extra = }} The Azad Pattan Hydropower Project is a 700 MW hydroelectric power station on the Jhelum River roughly 7 km upstream of Azad Pattan Bridge in the Sudhanoti District of Azad Kashmir and 90 km from Islamabad, the capital city of Pakistan.[2][3]The project is scheduled for completion by 2026.

Upon finalizing the EPC and other associated costs, the project company submitted its EPC tariff proposal on 23 June 2017. Following an intensive evaluation process, NEPRA determined the tariff vide Determination dated 17 May 2018. Tariff of US ¢ 7.12/kWh (levelized) was determined for the 30-year term; with an average of US ¢ 5.93/kWh. The average and levelized tariff for the first 10 years is US ¢ 8.13/kWh while the average tariff for the next 20 years is US ¢ 4.83/kWh (levelized US ¢ 5.20/kWh). This has the distinction of being the lowest tariff of all the large private hydropower projects (over 500MW) on rivers in Pakistan.[4]

The JCC (Joint Cooperation Committee) for CPEC related projects conducted a study on power market of Pakistan, which led to the decision that both sides will discuss the inclusion of the project at the fifth Expert Panel meeting.[5] Later project was added in CPEC.[6]

See also

References

  1. "Pakistan announces $1.5b hydropower project in AJK". tribune.com.pk. Retrieved 1 January 2018.
  2. Recorder, Business. "Azad Pattan HPP | Business Recorder". Business Recorder. Retrieved 2016-02-14.
  3. Change, United Nations Framework Convention on Climate. "CDM: Azad Pattan Hydropower Project". cdm.unfccc.int. Retrieved 2016-02-15.
  4. "Welcome to Laraib Group". www.laraibgroup.com. Retrieved 2019-03-13.
  5. "Pakistan proposes study of Jhelum river cascade". The Express Tribune. 2019-01-13. Retrieved 2019-03-13.
  6. "CPEC includes Kashmir hydropower project". The News International Pakistan. 2019-11-08. Retrieved 2019-11-08.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.