Line 10 (Shenyang Metro)
Line 10 | |
---|---|
10 | |
Overview | |
Type | Rapid transit |
System | Shenyang Metro |
Status | Operational |
Locale | Shenyang, Liaoning, China |
Termini |
Dingxianghu Zhangshabu |
Stations | 21 |
Services | 1 |
Operation | |
Opened | 2018 |
Owner | Shenyang |
Operator(s) | Shenyang Metro Corporation |
Character | Underground |
Technical | |
Line length | 27.21 km (16.91 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Line 10 of the Shenyang Metro (Chinese: 沈阳地铁10号线; pinyin: Shěnyáng Dìtiě Shí Hào Xiàn) is a rapid transit line running from northwest to southwest Shenyang in "Ↄ" shape. It will be operational by end of 2018. The line is 27.21 km long with 21 stations. Line 10, together with Line 9 will form a loop around Shenyang.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Dingxianghu — Zhangshabu | 2018 | 27.21 km (16.91 mi) | 21 | Northern section |
Stations (north to south)
station name | Transfer | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Dingxianghu | 丁香湖 | Yuhong | |||
Yuanjiang Street | 元江街 | ||||
Xianggong Street | 向工街 | ||||
Tawan Street | 塔湾街 | Huanggu | |||
Huaihe Street Shenyang Medical College Second Campus | 淮河街沈医二院 | 9 | |||
Bainiao Park | 百鸟公园 | ||||
Changjiang Street | 长江街 | ||||
Shenyang Medical College | 中医药大学 | 2 | |||
Lingdong Street | 陵东街 | Dadong | |||
Beita | 北塔 | ||||
Hezuo Street | 合作街 | ||||
Dongbei Main Road | 东北大马路 | ||||
Pangjiang Street | 滂江街 | 1 | |||
Chang'an Road | 长安路 | ||||
Wanlian | 万莲 | ||||
Quanyuan | 泉园 | Shenhe | |||
Jiangdong Street | 江东街 | ||||
Changqingqiao | 长青桥 | ||||
South Changqing Street | 长青南街 | 9 | Hunnan | ||
Shenyang Ligong University | 理工大学 | ||||
Zhangshabu | 张沙布 | ||||
References
This article is issued from
Wikipedia.
The text is licensed under Creative Commons - Attribution - Sharealike.
Additional terms may apply for the media files.