Floating wind turbine

The world’s first full-scale floating wind turbine, Hywind, being assembled in the Åmøy Fjord near Stavanger, Norway in 2009, before deployment in the North Sea

A floating wind turbine is an offshore wind turbine mounted on a floating structure that allows the turbine to generate electricity in water depths where fixed-foundation turbines are not feasible.[1] Floating wind farms have the potential to significantly increase the sea area available for offshore wind farms, especially in countries with limited shallow waters, such as Japan. Locating wind farms farther offshore can also reduce visual pollution,[1] provide better accommodation for fishing and shipping lanes,[2][3] and reach stronger and more consistent winds.[4]

Commercial floating wind turbines are mostly at the early phase of development, with several single turbine prototypes having been installed since 2007. As of 2018, the only operational floating wind farm is Hywind Scotland, developed by Statoil and commissioned in October 2017. The farm has 5 floating turbines with a total capacity of 30 MW.[5]

History

University of Maine's VolturnUS 1:8 was the first grid-connected offshore wind turbine in the Americas.[6]
The world's second full-scale floating wind turbine (and first to be installed without the use of heavy-lift vessels), WindFloat, operating at rated capacity (2 MW) approximately 5 km offshore of Aguçadoura, Portugal

The concept for large-scale offshore floating wind turbines was introduced by Professor William E. Heronemus at the University of Massachusetts Amherst in 1972. It was not until the mid 1990s, after the commercial wind industry was well established, that the topic was taken up again by the mainstream research community.[4]

Blue H Technologies of the Netherlands[7] deployed the first 80-kW floating wind turbine[8] 21.3 kilometres (13.2 mi) off the coast of Apulia, Italy in December 2007. The prototype was installed in waters 113 m deep in order to gather test data on wind and sea conditions, and was decommissioned at the end of 2008. The turbine utilized a tension-leg platform design and a two-bladed turbine.

A single floating cylindrical spar buoy moored by catenary cables. Hywind uses a ballasted catenary layout that adds 60 tonne weights hanging from the midpoint of each anchor cable to provide additional tension.

The first large-capacity, 2.3-megawatt floating wind turbine was Hywind,[9] which became operational in the North Sea near Norway in September 2009.[10][11] The turbine was constructed by Siemens Wind Power and mounted on a floating tower with a 100 m deep draft, with a float tower was constructed by Technip.

After assembly in the calmer waters of Åmøy Fjord near Stavanger, Norway, the 120 m tall tower was towed 10 km offshore into 220 m deep water, 10 km southwest of Karmøy, on 6 June 2009 for a two-year test deployment.[12] Alexandra Beck Gjorv of Statoil said, "[The experiment] should help move offshore wind farms out of sight … The global market for such turbines is potentially enormous, depending on how low we can press costs."[13] Hywind, owned by Statoil,[12] cost 400 million kroner (around US$62 million) to build and deploy.[14][15] The 13-kilometre (8.1 mi) long submarine power transmission cable was installed in July 2009 and system test including rotor blades and initial power transmission was conducted shortly thereafter.[16] The installation was expected to generate about 9 GW·h of electricity annually.[17] In 2010 it survived 11 meter waves with seemingly no wear.[18] By 2016, the turbine had produced 50 GWh; an overall capacity factor of 41%.[19]

In October 2011, WindFloat prototype was installed 4 km offshore of Aguçadoura, Portugal by Principle Power in approximately 45 m of water (previously the Aguçadoura Wave Farm site). The WindFloat was fitted with a Vestas V80 2.0-MW offshore wind turbine and grid connected. The installation was the first offshore wind turbine to be deployed without the use of any offshore heavy lift vessels as the turbine was fully commissioned onshore prior to the unit's being towed offshore. This is the first offshore wind turbine installed in open Atlantic waters, and the first to employ a semi-submersible type floating foundation.[20]

SeaTwirl deployed its first floating grid connected wind turbine off the coast of Sweden in August 2011. It was tested and decommissioned.[21] The design intended to store energy in a flywheel, thus, energy could be produced even after the wind stopped blowing.[22]

In June 2013, the University of Maine deployed the VolturnUS 1:8, a 65 foot (20 m) tall floating turbine prototype that is 1:8th the scale of a 6-megawatt (MW), 450 foot (140 m) rotor diameter design.[23] VolturnUS 1:8 was the first grid-connected offshore wind turbine deployed in the Americas. The VolturnUS design utilizes a concrete semi-submersible floating hull and a composite materials tower designed to reduce both capital and Operation & Maintenance costs, and to allow local manufacturing. The technology was the result of collaborative research and development conducted by the University of Maine-led DeepCwind Consortium.[24]

In June 2016, Maine’s New England Aqua Ventus I floating offshore wind demonstration project, designed by the DeepCwind Consortium, was selected by the U.S. Department of Energy to participate in the Offshore Wind Advanced Technology Demonstration program.[25]

In 2013, Statoil pulled out of the $120 million project of four 3-MW turbines floating in 140 m depth of water near Boothbay Harbor, Maine citing change in legislation,[26][27][28] and focused on their five 6-MW turbines in Scotland instead, where the average wind speed is 10 m/s and the water depth is 100 m.[29][30][31]

The first floating turbine in Japan was floated near Fukue Island in 2016, after a 5-year demonstration period near shore.[32] The 2-MW turbine was developed by Hitachi.

In 2015, Statoil received permission to install Hywind Scotland, a 30 MW floating wind farm 18 miles (29 km) off Peterhead using 5 Hywind turbines. Statoil also plans to test a 1 MWh lithium-ion battery system (called Batwind) with the farm. Hywind Scotland was commissioned in October 2017,[33][34][35][36][37] becoming the first commercial floating wind farm in operation. Construction of the NOK 2 billion (£152m) project started in 2016 in Spain, Norway and Scotland. The turbines were assembled at Stord in Norway in summer 2017 using the Saipem 7000 floating crane, and the finished turbines were moved to near Peterhead.[38][39][40] Three suction cup anchors hold each turbine.[41]

Anchoring systems

Left-hand tower-bearing structure (grey) is free floating, the right-hand structure is pulled by the tensioned cables (red) down towards the seabed anchors (light-grey).

Two common types of engineered design for anchoring floating structures include tension-leg and catenary loose mooring systems.[42]:2–4 Tension leg mooring systems have vertical tethers under tension providing large restoring moments in pitch and roll. Catenary mooring systems provide station–keeping for an offshore structure yet provide little stiffness at low tensions."[43] A third form of mooring system is the ballasted catenary configuration, created by adding multiple-tonne weights hanging from the midsection of each anchor cable in order to provide additional cable tension and therefore increase stiffness of the above-water floating structure.[43]

The IEC 61400–3 design standard requires that a loads analysis be based on site-specific external conditions such as wind, wave and currents.[42]:75 The IEC 61400–3-2 standard applies specifically to floating wind turbines.[44][45]

Economics

The technical feasibility of deepwater floating wind turbines is not questioned, as the long-term survivability of floating structures has been successfully demonstrated by the marine and offshore oil industries over many decades. However, the economics that allowed the deployment of thousands of offshore oil rigs have yet to be demonstrated for floating wind turbine platforms. For deepwater wind turbines, a floating structure will replace pile-driven monopoles or conventional concrete bases that are commonly used as foundations for shallow water and land-based turbines. The floating structure must provide enough buoyancy to support the weight of the turbine and to restrain pitch, roll and heave motions within acceptable limits. The capital costs for the wind turbine itself will not be significantly higher than current marine-proofed turbine costs in shallow water. Therefore, the economics of deepwater wind turbines will be determined primarily by the additional costs of the floating structure and power distribution system, which are offset by higher offshore winds and close proximity to large load centres (e.g. shorter transmission runs).[4]

As of 2009 however, the economic feasibility of shallow-water offshore wind technologies is more completely understood. With empirical data obtained from fixed-bottom installations off many countries since the late 1990s, representative costs are well understood. Shallow-water turbines cost between 2.4 and 3 million United States dollars per megawatt to install, according to the World Energy Council,[12] while the practical feasibility and per-unit economics of deep-water, floating-turbine offshore wind is yet to be established. Initial deployment of single full-capacity turbines in deep-water locations began only in 2009.[12]

As of October 2010, new feasibility studies are supporting that floating turbines are becoming both technically and economically viable in the UK and global energy markets. "The higher up-front costs associated with developing floating wind turbines would be offset by the fact that they would be able to access areas of deep water off the coastline of the UK where winds are stronger and reliable."[46] The recent Offshore Valuation study conducted in the UK has confirmed that using just one third of the UK's wind, wave and tidal resource could generate energy equivalent to 1 billion barrels of oil per year; the same as North Sea oil and gas production. A significant challenge when using this approach is the coordination needed to develop transmission lines.

A 2015 report by Carbon Trust recommends 11 ways to reduce cost.[47] Also in 2015, researchers at University of Stuttgart estimated cost at €230/MWh.[48]

Oil well injection

When oil fields become depleted, the operator injects water to keep pressure high for further extraction. This requires power, but installing gas turbines means shutting down the extraction process, losing valuable income. The classification society DNV GL has calculated that in some cases a floating wind turbine can economically provide power for injection, as the oil platform can keep on producing, avoiding a costly pause.[19][49]

In 2016 DNV GL, ExxonMobil and others approved calculations of saving $3/barrel of oil using a 6MW Hywind instead of traditional engines, driving two 2MW pumps injecting water into an offshore oil well. At least 44,000 barrels of processed water per day can be injected, even on calm June days.[50][51][52] The project began laboratory testing in 2017.[53]

Floating wind farms

The only operational floating wind farm is Hywind Scotland. The farm has 5 floating turbines with a total capacity of 30 MW.[5]

Proposals

As of September 2011, Japan had planned to build a pilot floating wind farm, with six 2-megawatt turbines, off the Fukushima coast of northeast Japan where the recent disaster has created a scarcity of electric power.[54][55] After the evaluation phase is complete in 2016, "Japan plans to build as many as 80 floating wind turbines off Fukushima by 2020."[54] The cost is expected to be in the range of 10–20 billion Yen over five years to build the first six floating wind turbines.[56] In 2011, some foreign companies had also planned to bid on the 1-GW large floating wind farm that Japan hoped to build by 2020.[57] In March 2012, Japan’s Ministry of Economy, Trade and Industry approved a 12.5bn yen ($154m) project to float a 2-MW Fuji in March 2013 and two 7-MW Mitsubishi hydraulic "SeaAngel" later about 20–40 km offshore in 100–150 metres of water depth. The Japanese Wind Power Association claims a potential of 519 GW of floating offshore wind capacity in Japan.[58] The first turbine became operational in November 2013.[59][60] In 2018, NEDO has announced two tenders to be launched in early February, aiming to support the development of both floating and fixed-bottom offshore wind projects in the country [61]

The US State of Maine solicited proposals in September 2010 to build a floating wind farm. The RFP is seeking proposals for 25 MW of deep-water offshore wind capacity to supply power for 20-year long-term contract period in the Gulf of Maine. Proposals were due by May 2011.[62][63] In April 2012 Statoil received state regulatory approval to build a large four-unit demonstration wind farm off the coast of Maine.[64] As of April 2013, the Hywind 2 4-tower, 12–15 MW wind farm was being developed by Statoil North America for placement 20 kilometres (12 mi) off the east coast of Maine in 140–158 metres (459–518 ft)-deep water of the Atlantic Ocean. Like the first Hywind installation off Norway, the turbine foundation will be a spar floater.[65] The State of Maine Public Utility Commission voted to approve the construction and fund the US$120 million project by adding approximately 75 cents/month to the average retail electricity consumer. Power could be flowing into the grid no earlier than 2016.[66] As a result of legislation in 2013 (LD 1472) by the State of Maine, Statoil placed the planned Hywind Maine floating wind turbine development project on hold in July 2013. The legislation required the Maine Public Utilities Commission to undertake a second round of bidding for the offshore wind sites with a different set of ground rules, which subsequently led Statoil to suspend due to increased uncertainty and risk in the project. Statoil is considering other locations for its initial US demonstration project.[67] Some vendors who could bid on the proposed project in Maine expressed concerns in 2010 about dealing with the United States regulatory environment. Since the proposed site is in Federal waters, developers would need a permit from the US Minerals Management Service, "which took more than seven years to approve a yet-to-be-built, shallow-water wind project off Cape Cod". Also, the agency is under fire in June 2010 for lax oversight of deepwater oil drilling in Federal waters. "Uncertainty over regulatory hurdles in the United States … is 'the Achilles heel' for Maine's ambitions for deepwater wind."[63]

Research

Scale modeling and computer modeling attempt to predict the behavior of large–scale wind turbines in order to avoid costly failures and to expand the use of offshore wind power from fixed to floating foundations. Topics for research in this field include:

Computer models

  • Overview of integrated dynamic calculations for floating offshore wind turbines[68]
  • Fully coupled aerohydro-servo-elastic response; a basic research tool to validate new designs[42]

Scale models

  • Water tank studies on 1:100 scale tension-leg platform and Spar Buoy platforms[69]
  • Dynamic response dependency on the mooring configuration[70]

Other applications

As they are suitable for towing, floating wind turbine units can be relocated to any location on the sea without much additional cost. So they can be used as prototype test units to practically assess the design adequacy and wind power potential of prospective sites.

When the transmission of generated wind power to nearby land is not economical, the power can be used in power to gas applications to produce hydrogen gas, ammonia / urea, reverse osmosis water desalination, natural gas, LPG, alkylate / gasoline, etc. on floating platforms which can be easily transported to nearby consuming centres.[71]

Floating wind turbines can be used to provide motive power for achieving artificial upwelling of nutrient-rich deep ocean water to the surface for enhancing fisheries growth in areas with tropical and temperate weather.[72] Though deep seawater (below 50 metres depth) is rich in nutrients such as nitrogen and phosphorus, the phytoplankton growth is poor due to the absence of sunlight. The most productive ocean fishing grounds are located in cold water seas at high latitudes where natural upwelling of deep sea water occurs due to inverse thermocline temperatures. The electricity generated by the floating wind turbine would be used to drive high–flow and low–head water pumps to draw cold water from below 50 meters water depth and mixed with warm surface water by eductors before releasing into the sea. Mediterranean Sea, Black Sea, Caspian Sea, Red Sea, Persian Gulf, deep water lakes/reservoirs are suitable for artificial upwelling for enhancing fish catch economically. These units can also be mobile type to utilise the seasonal favourable winds all around the year.

Floating design concepts

DeepWind

Risø and 11 international partners started a 4-year program called DeepWind in October 2010 to create and test economical floating Vertical Axis Wind Turbines up to 20 MW. The program is supported with 3m through EUs Seventh Framework Programme.[73][74] Partners include TUDelft, Aalborg University, SINTEF, Equinor and United States National Renewable Energy Laboratory.[75]

GICON

The GICON-TLP is a floating substructure system based on a tension leg platform (TLP) developed by GICON GmbH.[76] The system is deployable from 45 meters to 350 meters water depth. It consists of six major components: four buoyancy bodies, horizontal pipes for structural base, vertical pipes which pass through the water line, angled piles for connection with the transition piece. Casted nodes are used to connect all components. The TLP can be equipped with an offshore wind turbine in range of 6–10 MW.

The GICON-TLP is anchored to the seabed via four pre-tensioned mooring ropes with a buoyant gravity-base anchor consisting of concrete. No pile driving or drilling for anchoring is necessary. All ropes are connected at the corners of the square based system. The TLP for a 6MW wind turbine is currently being developed by the GICON Group and their key partner, the Endowed Chair for Wind Energy Technology (LWET) at the University of Rostock, utilizing prefabricated steel-concrete composite components in combination with components of steel.[77] A main focus of the TLP design is on the modularity and the possibility of assembly in any dry dock near to the installation site and without the use of construction vessels.[78][79] After offshore location is reached, joints of TLP and anchor will be decoupled and the gravity anchor will be lowered down by using ballast water. Once the anchor has reached the bottom, it is filled with sand. One unique feature of the system is the sufficient floating stability during transport as well as during operations.

In October 2017, model tests took place in the model test facility of French École Centrale de Nantes (ECN) with 1:50 model of the GICON®-TLP incl. wind turbine.[80] Based on this test a TRL of 5 was reached.

Ideol

Steel substructure for 3.2 MW NEDO project based on Ideol technology, fully coated in dry dock before wind turbine installation
Ideol's 2MW Floatgen demonstrator during hook-up at SemRev test site near Le Croisic

Ideol’s engineers have developed and patented a ring-shaped floating foundation based on a central opening system (Damping Pool) used for optimizing foundation + wind turbine stability. As such, the sloshing water contained in this central opening counteracts the swell-induced floater oscillations. Foundation-fastened mooring lines are simply attached to the seabed to hold the assembly in position. This floating foundation is compatible with all wind turbines without any modification and has reduced dimensions (from 36 to 55 metres per side for a wind turbine between 2 and 8 MW). Manufacturable in concrete or steel, this floating foundation allows for local construction near project sites. Ideol leads the FLOATGEN project, a floating wind turbine demonstration project based on Ideol’s technology, built by Bouygues Travaux Publics and to be installed off the coast of Le Croisic on the offshore experimentation site of Ecole Centrale de Nantes (SEM-REV). The construction of this project, France's first offshore wind turbine (precisely 2 MW), is completed and the floating wind turbine was installed in April 2018.

In June 2015, the company has sealed its first commercial contract with the Japanese conglomerate Hitachi Zosen, for the design of the two latest Japanese floating offshore wind demonstrators.[81] In July 2016, Ideol and Hitachi Zosen have signed a contract launching the construction phase of their 2 floating offshore wind turbines. Construction of the first one, manufactured in steel, is completed in dry dock and due to be commissioned before September 2018.[82]

In August 2017, the French government has selected Eolmed, a consortium led by Quadran in association with Ideol, Bouygues Travaux Publics and Senvion, a French renewable energy developer, for the development and construction of a 25MW Mediterranean floating offshore wind farm 15 km off the coastal town of Gruissan (Languedoc-Roussillon), planned to be commissioned 2020.[83]

Nautica Windpower

Nautica Windpower has proposed a technique for potentially reducing system weight, complexity and costs for deepwater sites. Scale model tests in open water have been conducted (September 2007) in Lake Erie and structural dynamics modeling was done in 2010 for larger designs.[84] Nautica Windpower's Advanced Floating Turbine (AFT) uses a single mooring line and a downwind two-bladed rotor configuration that is deflection tolerant and aligns itself with the wind without an active yaw system. Two-bladed, downwind turbine designs that can accommodate flexibility in the blades will potentially prolong blade lifetime, diminish structural system loads and reduce offshore maintenance needs, yielding lower lifecycle costs.[85]

SeaTwirl

SeaTwirl develops a floating vertical axis wind turbine (VAWT). The floater is based on a SPAR solution and is rotating along with the turbine. The concept limits the need for moving parts as well as bearings in the hub region. SeaTwirl is based in Gothenburg Sweden and is registered on the European growth market First North. 2015 SeaTwirl launched a 30kW prototype in the archipelago of Sweden which is connected to the grid at Lysekil. The aim is to scale the concept and to prove the scalability with a turbine of 1MW size in 2020. The concept is scalable for sizes well over 10MW.

VolturnUS

The VolturnUS design utilizes a concrete semi-submersible floating hull and a composite materials tower designed to reduce both capital and Operation & Maintenance costs, and to allow local manufacturing.

VolturnUS is North America’s first floating grid-connected wind turbine. It was lowered into the Penobscot River in Maine on 31 May 2013 by the University of Maine Advanced Structures and Composites Center and its partners.[86][87] During its deployment, it experienced numerous storm events representative of design environmental conditions prescribed by the American Bureau of Shipping (ABS) Guide for Building and Classing Floating Offshore Wind Turbines, 2013.[88]

The VolturnUS floating concrete hull technology can support wind turbines in water depths of 45 m or more. With 12 independent cost estimates from around the U.S. and the world, it has been found to significantly reduce costs compared to existing floating systems. The design has also received a complete third-party engineering review.[89]

In June 2016, the UMaine-led New England Aqua Ventus I project won top tier status from the US Department of Energy (DOE) Advanced Technology Demonstration Program for Offshore Wind. This means that the Aqua Ventus project is now automatically eligible for an additional $39.9 Million in construction funding from the DOE, as long as the project continues to meet its milestones.

WindFloat

External video
A video describing the WindFloat.
A diagram of the WindFloat system.

WindFloat is a floating foundation for offshore wind turbines designed and patented by Principle Power. A full-scale prototype was constructed in 2011 by Windplus, a joint-venture between EDP, Repsol, Principle Power, A. Silva Matos, Inovcapital, and FAI.[90] The complete system was assembled and commissioned onshore including the turbine. The entire structure was then wet-towed 400 kilometres (250 mi) (from southern to northern Portugal) to its final installed location 5 kilometres (3.1 mi) offshore of Aguçadoura, Portugal, previously the Aguçadoura Wave Farm. The WindFloat was equipped with a Vestas v80 2.0-megawatt turbine[91] and installation was completed on 22 October 2011. A year later, the turbine had produced 3 GWh.[92] The cost of this project is around €20 million (about US $26 million). This single wind turbine can produce energy to power 1300 homes.[93]

The subsea metal structure is reported to improve dynamic stability, whilst still maintaining shallow draft,[90] by dampening wave– and turbine–induced motion[94] utilizing a tri-column triangular platform with the wind turbine positioned on one of the three columns. The triangular platform is then "moored" using a conventional catenary mooring consisting of four lines, two of which are connected to the column supporting the turbine, thus creating an "asymmetric mooring."[95] As the wind shifts direction and changes the loads on the turbine and foundation, a secondary hull-trim system shifts ballast water between each of the three columns.[96] This permits the platform to maintain even keel while producing the maximum amount of energy. This is in contrast to other floating concepts which have implemented control strategies that de-power the turbine to compensate for changes in turbine thrust-induced overturning moment. This technology could allow wind turbines to be sited in offshore areas that were previously considered inaccessible, areas having water depth exceeding 40 m and more powerful wind resources than shallow-water offshore wind farms typically encounter.[97]

A 25 MW WindFloat project received government permission in December 2016, with EU funding the €48 million transmission cable. The €100 million project is expected to be funded by 2017 and operational by 2019.[98] Principle Power was planning a 30-MW WindFloat project using 6-MW Siemens turbines in 366 m of water near Coos Bay, Oregon to be operational in 2017,[99] but the project has since been cancelled.[100]

Others

A combined floating wave and wind power plant was installed at Vindeby Offshore Wind Farm in 2010.[101][102][103]

An open source project was proposed by former Siemens director Henrik Stiesdal in 2015 to be assessed by DNV GL. It suggests using tension leg platforms with replaceable pressurized tanks anchored to sheet walls.[104][105][106]

The International Energy Agency (IEA), under the auspices of their Offshore Code Comparison Collaboration (OC3) initiative, has completed high-level design and simulation modeling of the OC-3 Hywind system, a 5-MW wind turbine installed on a floating spar buoy, moored with catenary mooring lines, in water depth of 320 metres. The spar buoy platform would extend 120 metres below the surface and the mass of such a system, including ballast would exceed 7.4 million kg.[107]

VertiWind is a floating vertical axis wind turbine design created by Nenuphar [108] whose mooring system and floater are designed by Technip.[109] [110]

See also

References

  1. 1 2 Laskow, Sarah (13 September 2011). "Hope Floats for a New Generation of Deep-Water Wind Farms". Good Environment. Retrieved 12 October 2011.
  2. Mark Svenvold (9 September 2009). "The world's first floating wind turbine goes on line in Norway". DailyFinance.com. Retrieved 20 October 2009.
  3. Union of Concerned Scientists (15 July 2003). "Farming the Wind: Wind Power and Agriculture". Retrieved 20 October 2009.
  4. 1 2 3 Musial, W.; S. Butterfield; A. Boone (November 2003). "Feasibility of Floating Platform Systems for Wind Turbines" (PDF). NREL preprint. NREL (NREL/CP-500-34874): 14. Retrieved 10 September 2009.
  5. 1 2 "Hywind Scotland, World's First Floating Wind Farm, Performing Better Than Expected | CleanTechnica". cleantechnica.com. Retrieved 7 March 2018.
  6. Nation's first floating wind turbine launched, retrieved 5 July 2016
  7. "Deep Water - The ETI". The ETI. 18 July 2018.
  8. Deep water wind turbines, The Institution of Engineering and Technology, 18 October 2010, accessed 6 November 2011 Archived 26 November 2010 at the Wayback Machine.
  9. "Technology - Technology and innovation - equinor.com". www.statoil.com.
  10. Madslien, Jorn (8 September 2009). "Floating challenge for offshore wind turbine". BBC News. Retrieved 14 September 2009.
  11. Madslien, Jorn (5 June 2009). "Floating wind turbine launched". BBC News. Retrieved 14 September 2009.
  12. 1 2 3 4 Patel, Prachi (22 June 2009). "Floating Wind Turbines to Be Tested". IEEE Spectrum. Archived from the original on 28 June 2009. Retrieved 25 June 2009.
  13. "First offshore wind turbine goes to sea". UPI. 6 June 2009. Retrieved 7 June 2009.
  14. "Statoil Draws On Offshore Oil Expertise To Develop World's First Floating Wind Turbine". NewTechnology magazine. 8 September 2009. Retrieved 21 October 2009.
  15. Turker, Tux (19 May 2009). "Maine task force to identify offshore wind energy sites". Energy Current. Retrieved 7 June 2009.
  16. Donovan, Matthew (11 August 2009). "Subsea cable installed at Hywind project". Energy Current. Retrieved 2 September 2009.
  17. Terje Riis-Johansen, Minister of Petroleum and Energy, Norway (9 October 2009). "Speech: Opening of Hywind – the world's first full-scale floating wind turbine". Norway Ministry of Petroleum and Energy. Retrieved 21 October 2009.
  18. Nilsen, Jannicke. Statoil wants Hywind in Japan Teknisk Ukeblad, 4 April 2011. Accessed: 4 April 2011
  19. 1 2 "Floating wind-powered water injection". Offshore Wind. 25 November 2016. Retrieved 27 February 2017.
  20. "First WindFloat Successfully Deployed Offshore". 30 November 2011. Archived from the original on 11 March 2012.
  21. Justin Wilkes et al. The European offshore wind industry key 2011 trends and statistics p5 European Wind Energy Association, January 2012. Accessed: 26 March 2012
  22. "Teknisk fysik". Chalmers.se. Retrieved 2 December 2013.
  23. "VolturnUS 1:8 windturbine launches in 2013". Retrieved 5 July 2016.
  24. "DeepCwind Consortium | Advanced Structures & Composites Center | University of Maine". composites.umaine.edu. Retrieved 5 July 2016.
  25. "Maine Offshore Wind Project Moves to Top Tier of National Offshore Wind Demonstration Program". U.S. Senator Susan Collins. United States Senate. Retrieved 5 July 2016.
  26. Tux Turkel. "Statoil leaving Maine for more certain climate (page 1)" Page 2 Portland Press Herald, 15 October 2013. Accessed: 17 October 2013
  27. Sue Mello. "Statoil pulls out" Boothbay Register, 15 October 2013. Accessed: 17 October 2013
  28. Whit Richardson. "Statoil to quit work on $120 million offshore wind project in Maine" Bangor Daily News, 15 October 2013. Accessed: 17 October 2013
  29. THOMAS BO CHRISTENSEN. "Statoils amerikanske flydemøller blæst omkuld" EnergiWatch, 15 October 2013. Accessed: 17 October 2013
  30. "Hywind 2 Demonstration (UK) 30 MW", 4C. Accessed: 17 October 2013
  31. Simon Hadley. "Statoil floats Scottish plans Archived 22 October 2013 at the Wayback Machine." UK offshore wind. Accessed: 17 October 2013
  32. Japanese floater gets relocated 4C, 21 April 2016
  33. McCulloch, Scott (2 November 2015). "Statoil to pilot floating wind farm scheme offshore Peterhead".
  34. "Floating wind farm to be UK first". 2 November 2015 via www.bbc.com.
  35. Video on YouTube
  36. "Hywind Scotland Pilot Park - 4C Offshore". www.4coffshore.com.
  37. Nilsen, Jannicke. Statoil utvikler eget batteri-system for lagring av vindkraft Teknisk Ukeblad, 21 March 2016. Accessed: 21 March 2016
  38. "Nå starter monteringen av Statoils flytende vindmøller". SYSLA. 17 February 2017. Retrieved 20 February 2017.
  39. "Gigant-moduler til verdens første flytende vindpark har ankommet Stordbase". Teknisk Ukeblad. 16 February 2017. Retrieved 20 February 2017.
  40. "Floating turbines deliver first electricity". BBC News. 18 October 2017. Retrieved 18 October 2017.
  41. Jannicke Nilsen. "Sjekk dimensjonene: Disse kjettingene skal feste Statoils flytende vindmølle til havbunnen". Teknisk Ukeblad. Retrieved 20 April 2016.
  42. 1 2 3 Jonkman, J.M. "Dynamics Modeling and Loads Analysis of an Offshore Floating Wind Turbine" Technical Report NREL/TP-500-41958, NREL November 2007. Retrieved 25 June 2012
  43. 1 2 Floating Offshore Wind Turbines: Responses in a Seastate -- Pareto Optimal Designs and Economic Assessment, P. Sclavounos et al, October 2007
  44. "IEC - TC 88 Dashboard > Projects: Work programme, Publications, Maintenance cycle, Project files, TC/SC in figures". Iec.ch. 15 October 2010. Retrieved 2 December 2013.
  45. "Classification and Certification of Floating Offshore Wind Turbines" (PDF). Veristar.com. Archived from the original (PDF) on 3 December 2013. Retrieved 2 December 2013.
  46. "Floating turbines promise to deliver reliable wind, says report | Environment". theguardian.com. Retrieved 2 December 2013.
  47. Floating Offshore Wind Market Technology Review Carbon Trust
  48. https://www.sintef.no/globalassets/project/eera-deepwind-2015/presentations/f/f_matha_univ-stuttgart.pdf
  49. Nilsen, Jannicke. "DNV GL: Nå kan det lønne seg med flytende havvind til oljeplattformer" In English Teknisk Ukeblad, 20 January 2015. Accessed: 22 January 2015
  50. "DNV GL-led project gives green light for wind-powered oil recovery". DNV GL. Retrieved 4 May 2016.
  51. Tormod Haugstad. "Snart kan oljeselskapene få strøm fra flytende havvind - kan spare 3 dollar fatet". Teknisk Ukeblad. Retrieved 4 May 2016.
  52. Win-Win floating wind concept 'feasible' for oil & gas developments (paywall)
  53. "Offshore Wind Powered Oil Recovery Concept Step Closer to Reality". Offshorewind.biz. Retrieved 19 April 2017.
  54. 1 2 "Japan Plans Floating Wind Power Plant". Breakbulk. 16 September 2011. Retrieved 12 October 2011.
  55. Annette Bossler. "Floating turbines - Japan enters the stage" OffshoreWind, 12 September 2013. Accessed: 17 October 2013
  56. Yoko Kubota Japan plans floating wind power for Fukushima coast Reuters, 13 September 2011. Accessed: 19 September 2011
  57. Quilter, James (1 November 2011). "Statoil looks to Japan with Hywind concept". WindPower Monthly. Retrieved 1 December 2011.
  58. Patton, Dominique. Mitsubishi and Fuji named for Fukushima offshore wind farm Recharge News, 6 March 2012. Accessed: 8 March 2012
  59. Elaine Kurtenbach. "Japan starts up offshore wind farm near Fukushima" The Sydney Morning Herald, 12 November 2013. Accessed: 11 November 2013
  60. "Japan: Experimental Offshore Floating Wind Farm Project" OffshoreWind, 11 October 2013. Accessed: 12 October 2013
  61. "Japan: NEDO Takes Further Offshore Wind Steps".
  62. Maine seeks 30MW of offshore wind and tidal pilots, BrighterEnergy.org, 3 September 2010, accessed 12 September 2010
  63. 1 2 State point man on offshore wind clearly energized, Maine Sunday Telegram, 6 June 2010, accessed 13 June 2010: "In September, the state plans to send out bids to build the world's first floating, commercial wind farm off the Maine coast."
  64. Hampton, Stuart (30 April 2012). "Statoil to demonstrate floating offshore wind turbines in the US". Bizmology. Hoovers. Retrieved 20 May 2012. Statoil has secured the support of government officials in Maine to develop a demonstration wind park in the US with four full-scale offshore wind turbines.
  65. "Hywind 2 Demonstration (Maine)". Offshore Wind Farms Project Database. 4C Offshore. Retrieved 3 April 2013.
  66. "Pioneering Maine wind project passes 'biggest hurdle'". Portland Press Herald. 25 January 2013. Retrieved 3 April 2013.
  67. "USA: Statoil Freezes Hywind Maine Project". OffshoreWind.biz. 5 July 2013. Retrieved 2 August 2013.
  68. Andrew Cordle (GL Garrad Hassan) & Jason Jonkman (NREL). "State of the Art in Floating Wind Turbine Design Tools" NREL/CP-5000-50543, NREL October 2011. Retrieved 25 June 2012
  69. Naqvi, Syed Kazim. "Scale model experiments on floating offshore wind turbines" Worcester Polytechnic Institute, May 2012. Retrieved 25 June 2012
  70. "Offshore Wind Costs Fall Below New Nuclear Plants in U.K." Retrieved 17 September 2017.
  71. "Enhancing fish stocks with artificial upwelling". Retrieved 7 May 2017.
  72. Stage, Mie (11 November 2010). "Risø floats 20MW" (in Danish). Ingeniøren. Archived from the original on 14 November 2010. Retrieved 17 January 2011.
  73. DeepWind Archived 11 November 2010 at the Wayback Machine. Risø, sourcedate. Retrieved: 11 November 2010
  74. Munck, Susanne. Future turbines Archived 15 November 2010 at the Wayback Machine. Risø, Danish, 8 November 2010. Retrieved: 11 November 2010
  75. "Home: Das GICON®-SOF Schwimmendes Offshorefundament". www.gicon-sof.de.
  76. "Third-Generation Floating Offshore Foundation (SOF-3) - Stiftungslehrstuhl für Windenergietechnik - Universität Rostock". www.lwet.uni-rostock.de.
  77. GICON Firmengruppe (21 August 2015). "Transport und Installation GICON®-SOF mit Fundament und Schwergewichtsanker" via YouTube.
  78. Frank Adam u. a.: Entwicklung eines Fundaments für Offshore-Windenergieanlagen aus Stahl-Beton-Verbundbauteilen. In: Schiff & Hafen. Heft 11/2016, S. 40–43, ISSN 0938-1643
  79. "Gicon Floater Passes First Tank Test (VIDEO)".
  80. http://renews.biz/85423/french-help-japan-with-floaters/
  81. "Steel Ideol floating wind unit ready for tow-out off Ja". Recharge | Renewable energy news and articles. 13 June 2018. Retrieved 19 June 2018.
  82. "Senvion Turbines to Float off French Mediterranean Coast". Offshore Wind. Retrieved 1 August 2016.
  83. Braciszeski, Kevin (23 January 2010). "Why Not Floating Windmills?". Ludington Daily News. Archived from the original on 14 July 2011. Retrieved 8 February 2010.
  84. "US Offshore Wind Energy: A Path Forward" (PDF). Working Paper page 24. US Offshore Wind Collaborative. 16 October 2009. Retrieved 7 November 2009.
  85. Danko, Pete. "First US Floating Wind Turbine Launches In Maine". EarthTechling. Retrieved 2 December 2013.
  86. "Renewable energy: Wind power tests the waters". Nature News & Comment.
  87. "VolturnUS 1:8". UMaine Advanced Structures and Composites Center. University of Maine. Retrieved 5 July 2016.
  88. "New England Aqua Ventus I Selected by the DOE for up to $39.9 Million in Additional Funding | Advanced Structures & Composites Center | University of Maine". composites.umaine.edu. Archived from the original on 19 July 2016. Retrieved 5 July 2016.
  89. 1 2 Shankleman, Jessica. Vestas floats plan for WindPlus offshore demo Business Green, 18 February 2011. Accessed: 23 February 2011
  90. Shahan, Zachary. 1st-of-its-kind floating wind turbine technology to be deployed by Vestas & WindPlus Clean Technica, 23 February 2011. Accessed: 23 February 2011
  91. Snieckus, Darius (18 December 2012). "Principle Power lands $43m funding double for WindFloat". RechargeNews. Retrieved 21 December 2012.
  92. "Principle Power & EDP to Develop Floating Offshore Wind". expresso.sapo.pt. 28 February 2013. Retrieved 28 February 2013.
  93. "Vestas, WindPlus to deploy floating wind turbine structure". Composites World. 21 February 2011. Retrieved 2 December 2013.
  94. Balogh, Emily (18 December 2008). "Deepwater Offshore Wind Power Generation Using Oil and Gas Platform Technology". RenewableEnergyWorld.com. Retrieved 3 September 2009.
  95. Rasmussen, Daniel. Vestas in experiment with floating wind turbine Archived 24 February 2011 at the Wayback Machine. (in Danish). Source: Ing.dk, 21 February 2011. Accessed: 22 February 2011 "When the wind turns, the platform is kept level by pumping more water into one of the three cylinders."
  96. "Principle Power & EDP to Develop Floating Offshore Wind". RenewableEnergyWorld.com. 20 February 2009. Retrieved 3 September 2009.
  97. "WindFloat gets the green light". Retrieved 7 January 2017.
  98. Ros Davidson. "Floating turbines planned for US west coast" Windpower Offshore, 14 October 2013. Accessed: 23 November 2013
  99. WindFloat Pacific - Offshore Wind Pilot Project ""
  100. "Verdens første kombinerede bølge- og vindkraftanlæg søsat". Ingeniøren. 22 June 2010.
  101. "DP Energy, FPP join hands for UK's winds and waves". Tidal Energy Today. 8 November 2016. Retrieved 24 November 2016.
  102. Joint Wind Wave Testing and Validation of Floating Power Plant’s Renewable Hybrid Marine Renewables Infrastructure Network, 20 January 2015
  103. "Vindmøllepioner: 'Open source'-tilgang kan give førerposition på havmøllefundamenter" ['Open source' approach can provide leadership in offshore foundations]. Ingeniøren.
  104. "Google Oversæt". translate.google.dk.
  105. "Wind maverick Stiesdal launches cost-slashing floating foundation design". rechargenews.com.
  106. Offshore Code Comparison Collaboration within IEA Wind Task 23: Phase IV Results Regarding Floating Wind Turbine Modeling, 2010 European Wind Energy Conference (EWEC), 20–23 April 2010, Warsaw, Poland, accessed 11 September 2010
  107. "Nenuphar :: Accueil". Nenuphar-wind.com. Retrieved 2 December 2013.
  108. "Technip". Retrieved 2 December 2013.
  109. "Numerical Study on the Motions of the VertiWind Floating Offshore Wind Turbine". Archived from the original on 14 December 2013. Retrieved 10 December 2013.

Bibliography

  • Torsten Thomas: Solutions for floating foundations. In: Ship & Offshore, No. 5/2014, p 30–33, DVV Media Group, Hamburg 2014, ISSN 2191-0057
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.