Sasang–Hadan Line

Sasang–Hadan Line
Overview
System Busan Metro Busan Metro
Locale Busan, South Korea
Termini Sasang Station
Hadan Station
Stations 6 (Phase 1), 13 (Phase 2)
Operation
Planned opening 2021
Character Underground automated light metro
Technical
Line length 6.9 km (4.3 mi)

Sasang–Hadan Line is an under construction light metro line in Busan, South Korea. The first phase will be connecting Sasang Station to Hadan Station. The line is scheduled to open in 2021.

Infrastructure

All stations will have elevators, escalators, and platform screen doors. The line will be equipped for unmanned automatic operation and there are plans to build a central control system for managing the whole line, eliminating the need for staff to be present at stations. Construction began in 2016 and the line is expected to open in 2021 with total operating expenses of 73.2 billion won.[1]

Stations

Station
Number
Station name Transfer Distance
in km
Total
distance
Location
EnglishHangulHanja
501 Sasang 사상  BGL  - 0.0
Busan
Sasang District
502 - -
503 - -
504 - -
505 - - Saha District
506 Hadan 하단 6.90

See also

References

  1. "˝사상~하단선 3공구 재입찰˝ 부산교통공사의 형식적인 쇼". 국제신문.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.