Blue Origin

Blue Origin, LLC
Private
Industry Aerospace industry
Founded September 8, 2000 (2000-09-08)
Founder Jeff Bezos
Headquarters Kent, Washington, U.S.
Key people
  • Bob Smith (CEO)
[1]
Owner Jeff Bezos
Number of employees
1,500[2] (2018)
Subsidiaries
  • Blue Origin Florida
  • Blue Origin Texas
  • Blue Origin International
Website blueorigin.com

Blue Origin, LLC is an American privately funded aerospace manufacturer and spaceflight services company headquartered in Kent, Washington. Founded in 2000 by Jeff Bezos, the company is developing technologies to enable private human access to space with the goal to dramatically lower costs and increase reliability. Blue Origin is employing an incremental approach from suborbital to orbital flight, with each developmental step building on its prior work. The company motto is Gradatim Ferociter, Latin for "Step by Step, Ferociously".[3]

Blue Origin is developing a variety of technologies, with a focus on rocket-powered vertical takeoff and vertical landing (VTVL) vehicles for access to suborbital and orbital space.[4] The company's name refers to the blue planet, Earth, as the point of origin.[3]

Initially focused on suborbital spaceflight, the company has designed, built and flown multiple testbeds of its New Shepard spacecraft at its facility in Culberson County, Texas. Developmental test flight of the New Shepard,[5] named after the first American in space Alan Shepard, began in April 2015, and flight testing is continuing into 2018, with first passenger-carrying spaceflight expected in late 2018.[6] On nearly every one of the test flights since 2015, the uncrewed vehicle has flown to a planned test altitude of more than 100 km (330,000 ft) and achieved a top speed of more than Mach 3 (3,675 km/h; 2,284 mph), reaching space above the Kármán line, with both the space capsule and its rocket booster successfully soft landing, making reuse possible.[7] By 2016, the second New Shepard booster test article had made four flights, each time exceeding 100 km (330,000 ft) in altitude, before returning for successful soft landings.[8][9] The first crewed test flights are planned to take place in 2018,[10] with the start of commercial service in 2019.[11]

Blue Origin has become a part of a "dramatic metamorphosis" of the space industry in recent years,[12] having moved into the orbital spaceflight technology business in 2014, initially as a rocket engine supplier for others via a contractual agreement to build a new large rocket engine, the BE-4, for major US launch system operator United Launch Alliance (ULA). ULA is also considering the BE-3, Blue Origin's smaller rocket engine used on New Shepard, for use in a new second stage—the Advanced Cryogenic Evolved Stage (ACES)—which will become the primary upper stage for ULA's Vulcan orbital launch vehicle in the 2020s.[13] By 2015, Blue Origin had announced plans to also manufacture and fly its own orbital launch vehicle from the Florida Space Coast, known as the New Glenn. BE-4 is expected to complete engine qualification testing by late 2018.[6]

History

Blue Origin's three vehicles as of late 2012: (1) Goddard subscale demonstrator, flight tested in 2006–2007, (2) early, subscale version of the suborbital New Shepard propulsion module (as flown in 2011; variations exist to the larger New Shepard that actually flew in 2015), (3) future Space Vehicle (on top of a future orbital launch vehicle which, when stacked, is Blue Origin's future Orbital Transportation System).[14]

Blue Origin founder Jeff Bezos had been interested in space from an early age. A profile published in 2013 described a 1982 Miami Herald interview Bezos gave after he was named valedictorian of his high school class. The 18-year-old Bezos said he wanted "to build space hotels, amusement parks and colonies for 2 million or 3 million people who would be in orbit. 'The whole idea is to preserve the earth' he told the newspaper ... The goal was to be able to evacuate humans. The planet would become a park."[15]

In 1999, after watching the rocketry biopic film October Sky, Bezos discussed with science-fiction author Neal Stephenson the idea of forming a space company.[16][17] Blue Origin was founded in 2000 in Kent, Washington, and began developing both rocket propulsion systems and launch vehicles.[18] Since the founding, the company was very secretive about its plans[19][20] and emerged from its "self-imposed silence" only after 2015.[18]

While the company was formally incorporated in 2000, its existence became public only in 2003, when Bezos began buying land in Texas, and interested parties followed up on the purchases. This was a topic of some interest in local politics, and Bezos' rapid aggregation of lots under a variety of whimsically named shell companies was called a "land grab".[21]

From 2003 to 2017, Blue Origin was led by its president, Rob Meyerson. Now Senior Vice President, Meyerson leads the Advanced Development Program business.

In July 2013, the company employed approximately 250 people.[22] By May 2015, they had grown to approximately 400 employees, with 350 of those working on engineering, manufacturing and business operations in the Kent location[23] and approximately 50 in Texas supporting the engine-test and suborbital test-flight facility.[23] By April 2017, the company had more than 1000 employees.[18] In August 2018, the company was more than 1500 employees, more than double the number in early 2016, and is "expected to double again by the time New Glenn is flying."[2]

As of 2016, Blue Origin was spending US$1 billion a year, funded by Jeff Bezos' sales of Amazon stock.[24] In both 2017, and again in 2018, Bezos made public statements that he intends to fund Blue Origin with US$1 billion per year from sales of his equity in Amazon.[25]

New Shepard

New Logo

As early as 2005, Bezos had discussed plans to create a vertical-takeoff and landing spaceship called New Shepard. Plans for New Shepard were initially kept quiet, but Blue Origin's website indicated Bezos' desire to, "lower the cost of spaceflight so that ... we humans can better continue exploring the solar system."[26][27][19] By 2008, a publicized timetable for New Shepard indicated that Blue Origin intended to fly unmanned in 2011, and manned in 2012.[28] In a 2011 interview, Bezos indicated that he founded Blue Origin to send customers into space by focusing on two objectives: to decrease the cost and to increase the safety of human spaceflight.[29]

By July 2014, Bezos had invested over US$500 million of his own money into Blue Origin.[30] The first developmental test flight of the New Shepard occurred on April 29, 2015.[31] The uncrewed vehicle flew to its planned test altitude of more than 93.5 km (307,000 ft) and achieved a top speed of Mach 3 (3,675 km/h; 2,284 mph).[32] In July 2015, NanoRacks, a provider of services such as payload design and development, safety approvals, and integration, announced a partnership with Blue Origin to provide standardized payload accommodations for experiments flying on Blue Origin's New Shepard suborbital vehicle.[33] As of late 2016, Blue Origin projected that if all test flights operate as scheduled, they could begin flying passengers to space on the New Shepard in 2018.[34]

In September 2014, the company and United Launch Alliance (ULA) entered into a partnership whereby Blue Origin would produce a large rocket engine—the BE-4—for the Vulcan, the successor to the 10,000–19,000-kilogram-class (22,000–42,000 lb) Atlas V which has launched US national security payloads since the early 2000s, and will exit service in the late 2010s.[18] The 2014 announcement added that Blue Origin had been working on the engine for three years prior to the public announcement, and that the first flight on the new rocket could occur as early as 2019.[35] By April 2017, development and test of the 2,400 kN (550,000 lbf) BE-4 were progressing well and Blue Origin was expected to be selected for the ULA Vulcan rocket.[18] In April 2015, Blue Origin announced that it had completed acceptance testing of the BE-3 rocket engine that would power the New Shepard space capsule to be used for Blue Origin suborbital flights.[36]

On November 23, 2015, Blue Origin launched the New Shepard rocket to space for a second time[37] to an altitude of 100.53 km (329,839 ft), and vertically landed the rocket booster less than 1.5 metres (5 ft) from the center of the pad. The capsule descended to the ground under parachutes 11 minutes after blasting off and landed safely. This was the first time a booster had flown to space and returned to Earth, marking a major step in the pursuit of a fully reusable rocket.[38][39] This flight validated the vehicle architecture and design. The ring fin shifted the center of pressure aft to help control reentry and descent; eight large drag brakes deployed and reduced the vehicle’s terminal speed to 623 km/h (387 mph); hydraulically actuated fins steered the vehicle through 192 km/h (119 mph) high-altitude crosswinds to a location precisely aligned with and 1,500 m (5,000 ft) above the landing pad; then the highly throttleable BE-3 engine re-ignited to slow the booster as the landing gear deployed, and the vehicle descended the last 30 m (100 ft) at 7.1 km/h (4.4 mph) to touchdown on the pad.[40] On January 22, 2016, Blue Origin re-flew the same New Shepard booster that launched and landed vertically in November 2015, demonstrating reuse. This time, New Shepard reached an apogee of 101.7 km (333,582 ft) before both capsule and booster returned to Earth for recovery and reuse. On April 2, 2016, the same New Shepard booster again flew, now for a third time, reaching 103.4 km (339,178 ft), before again returning successfully.[8]

In September 2015, Blue Origin announced details of an unnamed planned orbital launch vehicle, indicating that the first stage would be powered by its BE-4 rocket engine currently under development, while the second stage would be powered by its recently completed BE-3 rocket engine. In addition, Blue Origin announced that it would both manufacture and launch the new rocket from the Florida Space Coast. No payload or gross launch weight was given. Bezos noted in interviews that this new launch vehicle would not compete for US government national security missions, leaving that market to United Launch Alliance and SpaceX.[41] Science-fiction author Neal Stephenson worked part-time at Blue Origin into late 2006[42] and credited the company's employees for ideas and discussions leading to his 2015 novel, Seveneves.

In March 2016, Blue Origin invited journalists to see the inside of its Kent, Washington headquarters and manufacturing facility for the first time. The company is planning for substantial growth in 2016 as it builds more crew capsules and propulsion modules for the New Shepard program and ramps up BE-4 engine builds to support full-scale development testing. Employment is expected to grow to 1,000 in 2016 from 600 in February.[43] Bezos also articulated a long-term vision for humans in space, seeing the potential to move much heavy industry completely off-Earth, "leaving our planet zoned strictly for 'residential and light industrial' use with an end state hundreds of years out "where millions of people would be living and working in space."[22] By March 2016, manned test flights were planned to take place by 2017, with possible commercial service in 2018.[44]

Also in March 2016, Bezos discussed his plans to offer space tourism services to space. Pointing out the "entertainment" aspect of the early "barnstormers" in really advancing aviation in the early days when such rides "were a big fraction of airplane flights in those early days," he sees space tourism playing a similar role: advancing "space travel and rocket launches, through tourism and entertainment."[45] On the other hand, there are no current plans to pursue the niche market of US military launches; Bezos has said he is unsure where Blue Origin would add any value in that market.[45]

New Glenn

On September 12, 2016, Blue announced that its orbital rocket would be named New Glenn in honor of the first American astronaut to orbit the Earth, John Glenn, and that the 7-meter-diameter (23 ft) first stage will be powered by seven Blue Origin BE-4 engines. The first stage is reusable and will land vertically, just like the New Shepard suborbital launch vehicle that preceded it.[46] At the time of the announcement of New Glenn, Bezos revealed that the next project beyond New Glenn would be New Armstrong, without detailing what that would be.[47]

In March 2017, Bezos announced that Blue Origin had acquired its first paying launch customer for orbital satellite launches. Eutelsat is expected to start launching TV satellites in 2022 on Blue Origin's New Glenn orbital launch vehicle.[48] A day after announcing Eutelsat, Blue Origin introduced OneWeb as its second customer.[49] In September 2017, Blue Origin closed a deal for New Glenn with its first Asian customer, mu Space Corp.[50] The company, based in Thailand, plans to provide satellite-based broadband services and space travel in Asia-Pacific.[51] On December 12, 2017, Blue Origin launched technology that could treat chest trauma in a space environment.[52]

In June 2018, Blue Origin indicated that while it continued to plan to fly initial internal passengers later in 2018, it would not be selling commercial tickets for New Shepard until 2019.[11]

Facilities

production facilities near the Kennedy Space Center, Florida

Blue Origin has a development facility near Seattle, Washington, and an operational launch facility in West Texas, where they also test rocket engines. Blue Origin has continued to expand its Seattle-area office and rocket production facilities in 2016—purchasing an adjacent 11,000 m2 (120,000 sq ft)-building[53]—and 2017, with permits filed to build a new 21,900 m2 (236,000 sq ft) warehouse complex and an additional 9,560 m2 (102,900 sq ft) of office space.[54]

Blue Origin manufactures rocket engines, launch vehicles, and space capsules in Washington. Its largest engine  BE-4  will be produced at a new manufacturing facility in Alabama.[55] In 2017, Blue Origin established a manufacturing facility for launch vehicles in Florida near where they will launch New Glenn from the Cape Canaveral Air Force Station, after initiating design and construction in 2015.[45][43][56]

Launch vehicles

Early, low-altitude flight test platforms

Charon

Blue Origin's first flight test vehicle, called Charon after Pluto's moon,[57] was powered by four vertically mounted Rolls-Royce Viper Mk. 301 jet engines rather than rockets. The low-altitude vehicle was developed to test autonomous guidance and control technologies, and the processes that the company would use to develop its later rockets. Charon made its only test flight at Moses Lake, Washington on March 5, 2005. It flew to an altitude of 96 m (316 ft) before returning for a controlled landing near the liftoff point.[58][59]

Charon is currently on display at The Museum of Flight in Seattle, Washington.[60]

Goddard

The next test vehicle, named the Goddard (also known as PM1), first flew on November 13, 2006. The flight was successful. A test flight for December 2 never launched.[61][62] According to Federal Aviation Administration records, two further flights were performed by Goddard.

New Shepard suborbital system

New Shepard Launch on April 29, 2015

Blue Origin's New Shepard suborbital spaceflight system is composed of two vehicles: a crew capsule accommodating three or more astronauts launched by a rocket booster. The two vehicles lift off together and are designed to separate during flight. After separation, the booster is designed to return to Earth to perform a vertical landing while the crew capsule follows a separate trajectory, returning under parachutes for a land touchdown. Both vehicles are intended for recovery and re-use.[63] New Shepard is controlled entirely by on-board computers.[64] In addition to flying astronauts, New Shepard is intended to provide frequent opportunities for researchers to fly experiments into suborbital space.[65]

New Shepard landing with parachutes on April 29, 2015

A Federal Aviation Administration NOTAM indicated that a flight test of an early suborbital test vehicle – PM2 – was scheduled for August 24, 2011.[66] The flight in west Texas failed when ground personnel lost contact and control of the vehicle. Blue Origin released its analysis of the failure on September 2. As the vehicle reached a speed of Mach 1.2 (1,470.1 km/h; 913.4 mph) and 14 km (46,000 ft) altitude, a "flight instability drove an angle of attack that triggered [the] range safety system to terminate thrust on the vehicle".[67]

On October 19, 2012, Blue Origin conducted a successful New Shepard pad escape test at its West Texas launch site, firing its pusher escape motor and launching a full-scale crew capsule from a launch vehicle simulator. The crew capsule traveled to an altitude of 703 m (2,307 ft) under active thrust vector control before descending safely by parachute to a soft landing 500 m (1,630 ft) downrange.[68]

In April 2015, Blue Origin announced its intent to begin autonomous test flights of New Shepard in 2015 as frequently as monthly. Blue Origin expected "a series of dozens of flights over the extent of the test program [taking] a couple of years to complete".[36]

On April 29, 2015, New Shepard made its first test flight. The uncrewed vehicle flew to its planned test altitude of more than 93.5 km (307,000 ft) and achieved a top speed of Mach 3 (3,675 km/h; 2,284 mph).[32] The crew capsule separated from the booster before returning to Earth for a landing under parachutes.

On November 23, 2015, New Shepard made its second test flight, reaching 100.5 km (330,000 ft) altitude with successful recovery of both crew capsule and booster.[69][70] The booster successfully performed a powered vertical landing.[70]

On January 22, 2016, Blue Origin re-flew the same New Shepard booster that launched and landed vertically in November 2015, demonstrating reuse. This time, New Shepard reached an apogee of 101.7 km (333,582 ft) before both capsule and booster returned to Earth for recovery and reuse.[71]

New Shepard booster and crew capsule after retirement

On April 2, 2016, the same New Shepard booster flew for a third time, reaching 103.4 km (339,178 ft), before returning successfully.[72]

On June 19, 2016, the same New Shepard booster again flew, now for a fourth time, again reaching over 100.6 km (330,000 ft), before again returning successfully.[9]

A fifth and final test flight of the second booster and test capsule took place in October 2016.

The first flight of the third booster took place in December 2017.

Blue Origin plans to fly test astronauts by 2018.[10]

New Glenn orbital launch vehicle

The New Glenn is a 7-metre (23 ft)-diameter two- or three-stage orbital launch vehicle that is expected to launch prior to 2020.[46]

The design work on the vehicle began in 2012. The high-level specifications for the vehicle were publicly announced in September 2016.[46]

The first stage will be powered by seven BE-4 engines, also designed and manufactured by Blue Origin. The first stage is reusable, just like the New Shepard suborbital launch vehicle that preceded it. The second stage, and an optional third stage for some flights, are both intended to be expendable.[46]

Orbital launch vehicle

Revealed in 2015, the Blue Origin orbital launch vehicle—which began to be referred to by the placeholder name of "Very Big Brother" in March 2016[22] [73]—is a two-stage-to-orbit liquid-propellant rocket.[41] The launcher is intended to be reusable.[74] In January 2016, Blue Origin announced that they plan to announce details about the launch vehicle later in 2016,[75] and a few details were released in March 2016 when Blue Origin indicated that the first orbital launch was expected, from the Florida launch facility, in 2020.[22]

The first stage is to be powered by Blue Origin's BE-4 single-shaft oxygen-rich staged combustion[76] liquid methane/liquid oxygen rocket engine while the second stage will be powered by the recently qualified BE-3 tap-off cycle liquid hydrogen/liquid oxygen rocket engine. The number of engines powering each stage has not been released, nor has the payload or gross launch weight specifications.[41] No details were publicly released as of September 2015.

Blue Origin intends to launch the rocket from the historic Launch Complex 36, and manufacture the rockets at a new facility on nearby land in Exploration Park. Acceptance testing of the BE-4 engines will also be done in Florida.[74]

Orbital subsystems and earlier development work

Blue Origin began developing systems for orbital human spacecraft prior to 2012. A reusable first-stage booster was projected to fly a suborbital trajectory, taking off vertically like the booster stage of a conventional multistage rocket. Following stage separation, the upper stage would continue to propel astronauts to orbit while the first-stage booster would descend to perform a powered vertical landing similar to the New Shepard suborbital Propulsion Module. The first-stage booster would be refueled and launched again, allowing improved reliability and lowering the cost of human access to space.[63]

The booster rocket was projected to loft Blue Origin’s biconic Space Vehicle to orbit, carrying astronauts and supplies. After orbiting the Earth, the Space Vehicle will reenter Earth’s atmosphere to land on land under parachutes, and then be reused on future missions to Earth orbit.[63]

Blue Origin successfully completed a System Requirements Review (SRR) of its orbital Space Vehicle in May 2012.[77]

Engine testing for the Reusable Booster System (RBS) vehicle began in 2012. A full-power test of the thrust chamber for Blue Origin BE-3 liquid oxygen, liquid hydrogen rocket engine was conducted at a NASA test facility in October 2012. The chamber successfully achieved full thrust of 100,000 pounds-force (about 440 kN).[78]

Test flights

Early test flights
DateVehicleNotes
March 5, 2005CharonReached altitude of 96 m (315 ft)[58]
November 13, 2006GoddardFirst rocket-powered test flight[79]
March 22, 2007Goddard[80]
April 19, 2007Goddard[81]
May 6, 2011PM2 (Propulsion Module)[82] [83]
August 24, 2011PM2 (Propulsion Module) Failure, loss of vehicle[83]
October 19, 2012New Shepard, capsule onlyPad escape test flight[68]
New Shepard test flights
DateVehicleNotes
April 29, 2015New Shepard 1Successful atmospheric flight to altitude 93.5 km (307,000 ft), capsule recovered, booster crashed on landing[84]
November 23, 2015New Shepard 2Successful Sub-orbital spaceflight and landing[85]
January 22, 2016New Shepard 2Successful sub-orbital flight and landing of a reused booster[86]
April 2, 2016New Shepard 2Successful sub-orbital flight and landing of a reused booster[8]
June 19, 2016New Shepard 2Successful sub-orbital flight and landing of a reused booster: The fourth launch and landing of the same rocket. Blue Origin published a live webcast of the takeoff and landing.[87]
October 5, 2016 New Shepard 2 Successful sub-orbital flight and landing of a reused booster: The fifth and final launch and landing of the same rocket (NS2).[88] The capsule separated when the rocket was at max Q to test the abort sequence in most extreme circumstances; unexpectedly, besides the capsule, the booster was also recovered despite the stress suffered at separation.[89]
December 12, 2017 New Shepard 3 Successful sub-orbital flight and landing. The first launch of NS3 and new Crew Capsule 2.0.[90]
April 29, 2018 New Shepard 3 Sub-orbital flight and landing, second launch of NS3. First flight with a commercial cargo payload of suborbital experiments, and first flight to be licensed by the FAA with a standard commercial launch license rather than under an experimental permit. Capsule peaked at 105.9 kilometres (65.8 mi) altitude.[91][92]
July 18, 2018 New Shepard 3 Ninth flight overall, and third of NS3, included several customer payloads.[93] Before reaching the apogee, the capsule engaged an abort sequence to test its stabilization modules, after which it reached 120 kilometres (393,000 ft).

Rocket engine development

BE-1

Blue Engine 1, or BE-1, was the first rocket engine developed by Blue Origin and was used on the company's Goddard development vehicle. The pressure-fed monopropellant engine was powered by peroxide and produced 9.8 kN (2,200 lbf) of thrust.[94][95]

BE-2

Blue Engine 2, or BE-2, was a pump-fed bipropellant engine burning kerosene and peroxide which produced 140 kN (31,000 lbf) of thrust.[94][95] Five BE-2 engines powered Blue Origin's PM-2 development vehicle on two test flights in 2011.[96]

BE-3

Blue Origin publicly announced the development of the Blue Engine 3, or BE-3, in January 2013, but the engine had begun development in the early 2010s. BE-3 is a new liquid hydrogen/liquid oxygen (LH2/LOX) cryogenic engine that can produce 490 kN (110,000 lbf) of thrust at full power, and can be throttled down to as low as 110 kN (25,000 lbf) for use in controlled vertical landings.[97]

Early thrust chamber testing began at NASA Stennis[98] in 2013.[99]

By late 2013, the BE-3 had been successfully tested on a full-duration suborbital burn, with simulated coast phases and engine relights, "demonstrating deep throttle, full power, long-duration and reliable restart all in a single-test sequence."[97] NASA has released a video of the test.[99] As of December 2013, the engine had demonstrated more than 160 starts and 9,100 seconds (2.5 h) of operation at Blue Origin’s test facility near Van Horn, Texas.[97][100]

BE-3 engine acceptance testing was completed by April 2015 with 450 test firings of the engine and a cumulative run time of more than 30,000 seconds (8.3 h). The BE-3 engine powers the New Shepard space capsule that is being used for Blue Origin suborbital flights that began in 2015.[36]

BE-3U

The BE-3U engine is a modified BE-3 for use on upper stages of Blue Origin orbital launch vehicles. The engine will include a nozzle better optimized for operation under vacuum conditions as well as a number of other manufacturing differences since it is an expendable engine whereas the BE-3 is designed for reusability.[20]

BE-4

BE-4 rocket engine, on display at the 34th Space Symposium, April 2018. It was the first BE-4 to be hotfire tested, on 18 October 2017.

Blue Origin began work on a new and much larger rocket engine in 2011. The new engine, the Blue Engine 4, or BE-4, is a change for Blue Origin in that it is their first engine that will combust liquid oxygen and liquid methane propellants. The engine has been designed to produce 2,400 kN (550,000 lbf) of thrust, and was initially planned to be used exclusively on a Blue Origin proprietary launch vehicle. Blue Origin did not announce the new engine to the public until September 2014.[101]

In late 2014, Blue Origin signed an agreement with United Launch Alliance (ULA) to co-develop the BE-4 engine, and to commit to use the new engine on an upgraded Atlas V launch vehicle, replacing the single RD-180 Russian-made engine. The new launch vehicle will use two of the 2,400 kN (550,000 lbf) BE-4 engines on each first stage. The engine development program began in 2011.[35][101]

When announced in 2014, and still in March 2016, ULA expected the first flight of the new launch vehicle—the Vulcan—no earlier than 2019.[101][22] As of March 2018, Blue intends to complete engine qualification testing by late 2018, but no date for the first launch event has been recently stated by ULA.[6]

Pusher escape motor

Blue Origin partnered with Aerojet Rocketdyne to develop a pusher launch escape system for the New Shepard suborbital Crew Capsule. Aerojet Rocketdyne provides the Crew Capsule Escape Solid Rocket Motor (CCE SRM) while the thrust vector control system that steers the capsule during an abort is designed and manufactured by Blue Origin.[102][103]

In late 2012, Blue Origin performed a pad abort test of the escape system on a full-scale suborbital capsule.[68] Four years later in 2016, the escape system was successfully tested in-flight at the point of highest dynamic pressure as the vehicle reached transonic velocity.[88]

Funding

By July 2014, Jeff Bezos had invested over US$500 million into Blue Origin.[30] Even by March 2016, the vast majority of funding to support technology development and operations at Blue Origin has come from Jeff Bezos' private investment, but Bezos had declined to publicly state the amount[43] prior to 2017 when an annual amount was stated publicly.[104] Blue Origin has also completed work for NASA on several small development contracts, receiving total funding of US$25.7 million by 2013.[105][106] As of April 2017, Bezos is selling approximately US$1 billion in Amazon stock each year to privately finance Blue Origin.[104]

Collaborations

With NASA

Blue Origin has contracted to do work for NASA on several development efforts. The company was awarded US$3.7 million in funding in 2009 by NASA via a Space Act Agreement[105][107] under the first Commercial Crew Development (CCDev) program for development of concepts and technologies to support future human spaceflight operations.[108][109] NASA co-funded risk-mitigation activities related to ground testing of (1) an innovative ‘pusher’ escape system, that lowers cost by being reusable and enhances safety by avoiding the jettison event of a traditional ‘tractor’ Launch Escape System, and (2) an innovative composite pressure vessel cabin that both reduces weight and increases safety of astronauts.[105] This was later revealed to be a part of a larger system, designed for a biconic capsule, that would be launched atop an Atlas V rocket.[110] On November 8, 2010, it was announced that Blue Origin had completed all milestones under its CCDev Space Act Agreement.[111]

In April 2011, Blue Origin received a commitment from NASA for US$22 million of funding under the CCDev phase 2 program.[106] Milestones included (1) performing a Mission Concept Review (MCR) and System Requirements Review (SRR) on the orbital Space Vehicle, which utilizes a biconic shape to optimize its launch profile and atmospheric reentry, (2) further maturing the pusher escape system, including ground and flight tests, and (3) accelerating development of its BE-3 LOX/LH2 440 kN (100,000 lbf) engine through full-scale thrust chamber testing.[112]

In 2012, NASA’s Commercial Crew Program released its follow-on CCiCap solicitation for the development of crew delivery to ISS by 2017. Blue Origin did not submit a proposal for CCiCap, but is reportedly continuing work on its development program with private funding.[113] Blue Origin had earlier attempted to lease a different part of the Space Coast, when they submitted a bid in 2013 to lease Launch Complex 39A (LC39A) at the Kennedy Space Center—on land to the north of, and adjacent to, Cape Canaveral AFS—following NASA's decision to lease the unused complex out as part of a bid to reduce annual operation and maintenance costs. The Blue Origin bid was for shared and non-exclusive use of the LC39A complex such that the launchpad was to have been able to interface with multiple vehicles, and costs for using the launch pad were to have been shared across multiple companies over the term of the lease. One potential shared user in the Blue Origin notional plan was United Launch Alliance. A competing bid for commercial use of the LC39A launch complex was submitted by SpaceX, which submitted a bid for exclusive use of the launch complex to support their crewed missions.[114]

In September 2013—before completion of the bid period, and before any public announcement by NASA of the results of the process—Blue Origin filed a protest with the U.S. General Accounting Office (GAO) "over what it says is a plan by NASA to award an exclusive commercial lease to SpaceX for use of mothballed space shuttle launch pad 39A".[115] NASA had planned to complete the bid award and have the pad transferred by October 1, 2013, but the protest "will delay any decision until the GAO reaches a decision, expected by mid-December".[115] SpaceX said that they would be willing to support a multi-user arrangement for pad 39A.[116] In December 2013, the GAO denied the Blue Origin protest and sided with NASA, which argued that the solicitation contained no preference on the use of the facility as either multi-use or single-use. "The [solicitation] document merely [asked] bidders to explain their reasons for selecting one approach instead of the other and how they would manage the facility."[117] In the event, NASA selected the SpaceX proposal in late 2013 and signed a 20-year lease contract for Launch Pad 39A to SpaceX in April 2014.[118]

With DARPA

Blue Origin cooperated with Boeing in Phase 1 of the DARPA XS-1 spaceplane program.[119]

United Launch Alliance

In September 2018, it was announced that Blue Origin's BE-4 engine was selected by United Launch Alliance to provide first-stage rocket engines for their latest booster design, the Vulcan rocket. The BE-4 engine is set to replace the Russian-build RD-180 powering ULA's Atlas 5.[120]

See also

References

  1. Sheetz, Michael (April 18, 2018). "Blue Origin's new rocket engine will be able to launch '100 full missions,' CEO says". Cnbc.com. Retrieved October 9, 2018.
  2. 1 2 Johnson, Eric M. (2 August 2018). "Bezos throws cash, engineers at rocket program as space race accelerates". Reuters. Retrieved 4 August 2018.
  3. 1 2 "Gradatim Ferociter! Jeff Bezos explains Blue Origin's motto, logo … and the boots". GeekWire. 2016-10-25. Retrieved 2018-01-25.
  4. "Blue Origin". Blue Origin. Retrieved December 5, 2013.
  5. "Blue Origin Engineer Talks Next Steps for New Shepard, New Glenn". Space.com. Retrieved 2018-01-25.
  6. 1 2 3 Foust, Jeff (2018-04-19). "Blue Origin expects BE-4 qualification tests to be done by year's end". SpaceNews. Retrieved 2018-04-21.
  7. Palmer, Katie. "Jeff Bezos' Blue Origin Rocket Took Off and Landed—Again". Wired. Wired.com. Retrieved January 22, 2016.
  8. 1 2 3 Calandrelli, Emily (April 2, 2016). "Blue Origin launches and lands the same rocket for a third time". Retrieved April 3, 2016.
  9. 1 2 Grush, Loren (June 19, 2016). "Blue Origin safely launches and lands the New Shepard rocket for a fourth time". Retrieved June 19, 2016.
  10. 1 2 "Blue Origin has built three new rockets, may begin flying again this summer".
  11. 1 2 Foust, Jeff (21 June 2018). "Blue Origin plans to start selling suborbital spaceflight tickets next year". SpaceNews. Retrieved 2018-06-25.
  12. Holmes, Mark (2018-05-23). "Jeff Bezos: Day One in the Space Industry". Via Satellite. Retrieved 2018-05-24. the industry has undergone a dramatic metamorphosis over the last few years. Nowhere has this been more apparent than in the launch market where SpaceX effected a revolution. Now, others are getting in on the act. Jeff Bezos [is now] launching rockets.
  13. Gruss, Mike (April 13, 2015). "ULA's Vulcan Rocket To be Rolled out in Stages". SpaceNews. Retrieved April 17, 2015.
  14. "NasaTelevision: Commercial Crew Progress Status Update". Youtube.com. January 9, 2013. Retrieved December 5, 2013.
  15. Whoriskey, Peter (August 11, 2013). "For Jeff Bezos, a new frontier". Washington Post. Retrieved October 3, 2015.
  16. Davenport, Christian (2018). The Space Barons: Elon Musk, Jeff Bezos, and the Quest to Colonize the Cosmos. PublicAffairs, an imprint owned by Hachette Book Group. ISBN 9781610398299.
  17. Jeff Foust (26 March 2018). "Reviews: Rocket Billionaires and The Space Barons". The Space Review.
  18. 1 2 3 4 5 de Selding, Peter B. (2017-04-14). "Blue Origin's older than SpaceX in more ways than one". Space Intel Report. Retrieved 2017-04-15.
  19. 1 2 Alan Boyle (June 24, 2006). "Blue's Rocket Clues". msnbc. Archived from the original on April 11, 2008. Retrieved May 28, 2008.
  20. 1 2 Foust, Jeff (December 7, 2013). "Blue Origin shows off its engine". NewSpace Journal. Retrieved December 10, 2013.
  21. Mylene Mangalindan (November 10, 2006). "Buzz in West Texas is about Jeff Bezos space craft launch site". The Wall Street Journal. Retrieved May 28, 2008.
  22. 1 2 3 4 5 Boyle, Alan (March 5, 2016). "Jeff Bezos lifts curtain on Blue Origin rocket factory, lays out grand plan for space travel that spans hundreds of years". GeekWire. Retrieved March 9, 2016.
  23. 1 2 "Local engineers aim high for cheaper spaceflight". Seattle Times. May 31, 2015. Retrieved June 1, 2015.
  24. Nicolas St. Fleur (5 April 2017). "- Jeff Bezos Says He Is Selling $1 Billion a Year in Amazon Stock to Finance Race to Space". The New York Times.
  25. Jeff Bezos reveals what it's like to build an empire and become the richest man in the world — and why he's willing to spend $1 billion a year to fund the most important mission of his life, Business Insider, 28 April 2018, accessed 1 May 2018.
  26. "Accidents Won't Stop Private Space Industry's Push to Final Frontier". WIRED. Retrieved 2018-07-17.
  27. Michael Graczyk (March 15, 2005). "Blue Origin Spaceport Plans are Talk of Texas Town". space.com. Archived from the original on July 24, 2008. Retrieved May 28, 2008.
  28. Archived December 17, 2008, at the Wayback Machine.
  29. Levy, Stephen (November 13, 2011). "Jeff Bezos Owns the Web in More Ways Than You Think". Wired. Retrieved December 9, 2011.
  30. 1 2 Foust, Jeff (July 18, 2014). "Bezos Investment in Blue Origin Exceeds $500 Million". Space News. Retrieved July 20, 2014.
  31. "Watch the incredible first test flight of Jeff Bezos's mysterious new rocket". Business Insider. Retrieved 2018-07-17.
  32. 1 2 Foust, Jeff. "Senior Staff Writer". Space News. Retrieved May 5, 2015.
  33. Foust, Jeff (July 16, 2015). "NanoRacks And Blue Origin Team To Fly Suborbital Research Payloads". SpaceNews.
  34. Morris, David (October 15, 2016). "Blue Origin Will Take Tourists to Space by 2018". Fortune.com. Retrieved December 6, 2016.
  35. 1 2 Achenbach, Joel (September 17, 2014). "Jeff Bezos's Blue Origin to supply engines for national security space launches". Washington Post. Retrieved September 27, 2014.
  36. 1 2 3 Foust, Jeff (April 13, 2015). "Blue Origin's suborbital plans are finally ready for flight". Retrieved April 18, 2015. We’ve recently completed acceptance testing, meaning we’ve accepted the engine for suborbital flight on our New Shepard vehicle, [the end of a] very, very long development program [of] 450 test firings of the engine and a cumulative run time of more than 500 min [8.3 h]. The completion of those tests sets the stage for Blue Origin to begin test flights of the vehicle later this year at its facility in West Texas [where they] expect a series of flight tests with this vehicle ... flying in autonomous mode ... We expect a series of dozens of flights over the extent of the test program [taking] a couple of years to complete.
  37. Chang, Kenneth. "Journalist". The New York Times. The New York Times. Retrieved November 24, 2015.
  38. Cofeld, Calla. "Staff Witer". Space.com. Space.com. Retrieved November 25, 2015.
  39. "Blue Origin Launches Bezos's Space Dreams and Lands a Rocket". Retrieved 2018-07-17.
  40. Jeff, Bezos. "Historic Rocket Landing". www.blueorigin.com. Blue Origin. Retrieved November 23, 2015.
  41. 1 2 3 Foust, Jeff (September 15, 2015). "Bezos Not Concerned About Competition, Possible ULA Sale". Space News. Retrieved September 16, 2015.
  42. Archived August 13, 2009, at the Wayback Machine.
  43. 1 2 3 Foust, Jeff (March 8, 2016). "Blue Origin plans growth spurt this year". SpaceNews. Retrieved March 13, 2016.
  44. Fedde, Corey (March 9, 2016). "How Blue Origin plans to soon send people into space, safely". Christian Science Monitor. Retrieved March 10, 2016.
  45. 1 2 3 Price, Wayne T. (March 12, 2016). "Jeff Bezos' Blue Origin could change the face of space travel". Florida Today. Retrieved March 13, 2016.
  46. 1 2 3 4 Bergin, Chris (September 12, 2016). "Blue Origin introduce the New Glenn orbital LV". NASASpaceFlight.com. Retrieved September 12, 2016.
  47. Samantha Masunaga (September 12, 2016). "Blue Origin's new, more powerful rocket will compete with SpaceX". Los Angeles Times.
  48. Cecilia King (7 March 2017). "Blue Origin, Jeff Bezos's Moon Shot, Gets First Paying Customer". The New York Times.
  49. "Jeff Bezos adds OneWeb satellite venture to Blue Origin's New Glenn launch manifest". GeekWire. 2017-03-08. Retrieved 2018-01-25.
  50. "The Rocket Company of Jeff Bezos Has Its First Asian Customer - Finance.co.uk- Breaking Financial News Updates From Around The World | Latest News Headlines". Finance.co.uk- Breaking Financial News Updates From Around The World | Latest News Headlines. 2017-09-26. Retrieved 2018-01-25.
  51. "Blue Origin announces satellite launch deal with Thai telecom startup Mu Space". GeekWire. 2017-09-26. Retrieved 2018-01-25.
  52. "NASA Funds Flight for Space Medical Technology on Blue Origin". link.galegroup.com. Retrieved 2018-02-05.
  53. Stile, Marc (October 20, 2016). "Bezos' rocket company, Blue Origin, is the new owner of an old warehouse in Kent". bizjournals.com. Puget Sound Business Journal. Retrieved February 16, 2017.
  54. "Jeff Bezos' Blue Origin space venture has plans for big expansion of Seattle-area HQ". Geekwire.com. February 22, 2017. Retrieved August 11, 2017.
  55. "Blue Origin will build its rocket engine in Alabama because the space industry is ruled by politics". The Verge. Retrieved 2018-07-17.
  56. "Bezos' Blue Origin to build, launch rockets in Fla". USA TODAY. Retrieved 2018-07-17.
  57. Boyle, Alan. "Amazon.com billionaire's 5-ton flying jetpack lands in Seattle museum". NBC News. Retrieved February 2, 2017.
  58. 1 2 "Blue Origin Charon Test Vehicle". The Museum of Flight. Retrieved March 4, 2013.
  59. "Blue Origin's Original Charon Flying Vehicle Goes on Display at The Museum of Flight". The Museum of Flight. Archived from the original on March 28, 2013. Retrieved March 4, 2013.
  60. "Blue Origin Charon Test Vehicle". Museum of Flight. Retrieved August 6, 2016.
  61. Alan Boyle (November 28, 2006). "Blue Origin Rocket Report". cosmiclog.msnbc.msn.com. Archived from the original on April 15, 2008. Retrieved May 28, 2008.
  62. Alan Boyle (December 2, 2006). "Blue Alert For Blastoff". cosmiclog.msnbc.msn.com. Archived from the original on May 7, 2008. Retrieved May 28, 2008.
  63. 1 2 3 "Blue Origin – About Blue". Archived from the original on March 25, 2013. Retrieved April 5, 2013.
  64. Archived May 15, 2009, at the Wayback Machine.
  65. "Blue Origin – Research". Archived from the original on April 13, 2013. Retrieved April 5, 2013.
  66. "1/3552 NOTAM Details". Federal Aviation Administration. August 23, 2011. Retrieved August 23, 2011.
  67. Bezos, Jeff (September 2, 2011). "Successful Short Hop, Set Back, and Next Vehicle". Letter. Blue Origin. Archived from the original on September 2, 2011. Retrieved September 3, 2011.
  68. 1 2 3 "Blue Origin Conducts Successful Pad Escape Test". Blue Origin. October 22, 2012. Retrieved December 5, 2013.
  69. "Blue Origin Makes Historic Rocket Landing". Blue Origin. November 24, 2015. Retrieved November 24, 2015.
  70. 1 2 Amos, Jonathan (November 24, 2015). "New Shepard: Bezos claims success on second spaceship flight". BBC News. Retrieved November 26, 2015.
  71. Dillow, Clay. "Reporter". Fortune.com. Fortune.com. Retrieved January 22, 2016.
  72. Calandrelli, Emily. "Blue Origin releases video from third launch and landing of New Shepard". TechCrunch.com. Retrieved April 4, 2016.
  73. Berger, Eric (March 9, 2016). "Behind the curtain: Ars goes inside Blue Origin's secretive rocket factory". Ars Technica. Retrieved March 9, 2016.
  74. 1 2 Jeff Bezos plans to boost humans into space from Cape Canaveral, CBS News, accessed September 17, 2015. Bezos: "You cannot afford to be a space-fairing civilization if you throw the rocket away every time you use it. ... We have to be focused on reusability, we have to be focused on lowering the cost of space."
  75. Bergin, Chris (January 22, 2016). "Blue Origin conduct successful reuse test with New Shepard". NASASpaceFlight.com. Retrieved January 25, 2016. hope to share details about this first orbital vehicle this year. And launch and land our New Shepard rocket – again and again.
  76. "Breaking News | ULA taps Blue Origin for powerful new rocket engine". Spaceflightnow.com. Retrieved April 8, 2015.
  77. "Blue Origin Completes Spacecraft System Requirements Review". Retrieved April 5, 2013.
  78. "Blue Origin tests 100k lb LOX/LH2 engine in commercial crew program". NewSpace Watch. October 16, 2012. Retrieved October 17, 2012. (Subscription required (help)).
  79. Graczyk, Michael (November 14, 2006). "Private space firm launches 1st test rocket". Associated Press. Archived from the original on January 7, 2007. Retrieved January 9, 2007.
  80. Boyle, Alan (March 23, 2007). "Rocket Revelations". MSNBC. Archived from the original on January 19, 2008. Retrieved January 29, 2008.
  81. "Recently Completed/Historical Launch Data". FAA AST. Retrieved February 3, 2008.
  82. "Recently Completed/Historical Launch Data". FAA AST. Retrieved May 30, 2011.
  83. 1 2 "Blue Origin has a bad day (and so do some of the media)". Retrieved September 3, 2011.
  84. Harwood, Bill (April 30, 2015). "Bezos' Blue Origin completes first test flight of 'New Shepard' spacecraft". Spaceflight Now via CBS News. Retrieved May 11, 2015.
  85. Pasztor, Andy (November 24, 2015). "Jeff Bezos's Blue Origin Succeeds in Landing Spent Rocket Back on Earth". Wall Street Journal. Retrieved November 24, 2015.
  86. "Launch. Land. Repeat". Retrieved January 23, 2016.
  87. Boyle, Alan (June 19, 2016). "Jeff Bezos' Blue Origin live-streams its spaceship's risky test flight". GeekWire. Retrieved June 21, 2016.
  88. 1 2 Foust, Jeff (October 5, 2016). "Blue Origin successfully tests New Shepard abort system". SpaceNews. Retrieved October 5, 2016.
  89. Blue Origin (October 6, 2016). "Max Q In-Flight Escape (slow motion)". YouTube. Retrieved October 9, 2018.
  90. "Jeff Bezos Shows Off What It's Like to Ride His New Rocket Capsule Into Space". Fortune.com. Retrieved 2018-01-25.
  91. "Blue Origin will livestream its first test flight of 2018". Engadget.com. Retrieved October 9, 2018.
  92. Blue Origin Launches New Shepard Space Capsule on Highest Test Flight Yet. Tariq Malik, Space. April 2018.
  93. "Payload Manifest on Mission 9". Blueorigin.com. July 17, 2018. Retrieved October 9, 2018.
  94. 1 2 "Blue Origin Engines". Blue Origin. Retrieved May 15, 2018.
  95. 1 2 @jeff_foust (March 10, 2018). "Rob Meyerson shows this chart of the various engines Blue Origin has developed and the vehicle that have used, or will use, them. #spaceexploration" (Tweet) via Twitter.
  96. Krebs, Gunter (April 29, 2018). "New Shepard". Gunter's Space Page. Retrieved May 15, 2018.
  97. 1 2 3 Messier, Doug (December 3, 2013). "Blue Origin Tests New Engine in Simulated Suborbital Mission Profile". Parabolic Arc. Retrieved December 5, 2013.
  98. "Updates on commercial crew development". NewSpace Journal. January 17, 2013. Retrieved January 21, 2013.
  99. 1 2 Messier, Doug (December 3, 2013). "Video of Blue Origin Engine Test". Parabolic Arc. Retrieved December 5, 2013.
  100. Blue Origin Tests New Engine, Aviation Week, 2013-12-09, accessed September 16, 2014.
  101. 1 2 3 Ferster, Warren (September 17, 2014). "ULA To Invest in Blue Origin Engine as RD-180 Replacement". Space News. Retrieved September 19, 2014.
  102. "Aerojet Motor Plays Key Role in Successful Blue Origin Pad Escape". Aerojet Rocketdyne. Retrieved May 14, 2018.
  103. "Aerojet Rocketdyne Motor Plays Key Role in Successful Blue Origin In-Flight Crew Escape Test". Aerojet Rocketdyne. Retrieved May 14, 2018.
  104. 1 2 St. Fleur, Nicholas (2017-04-05). "Jeff Bezos Says He Is Selling $1 Billion a Year in Amazon Stock to Finance Race to Space". The New York Times. Retrieved 2017-04-23.
  105. 1 2 3 "Blue Origin Space Act Agreement" (PDF). Nasa.gov. Retrieved December 5, 2013.
  106. 1 2 Morring, Frank, Jr. (April 22, 2011). "Five Vehicles Vie To Succeed Space Shuttle". Aviation Week. Archived from the original on December 21, 2011. Retrieved February 23, 2011. the CCDev-2 awards, ... went to Blue Origin, Boeing, Sierra Nevada Corp. and Space Exploration Technologies Inc. (SpaceX).
  107. "Blue Origin Space Act Agreement, Amendment One" (PDF). NASA. Retrieved December 5, 2013.
  108. "NASA Selects Commercial Firms to Begin Development of Crew Transportation Concepts and Technology Demonstrations for Human Spaceflight Using Recovery Act Funds". press release. NASA. February 1, 2010. Retrieved February 2, 2010.
  109. Jeff Foust. "Blue Origin proposes orbital vehicle". Newspacejournal.com. Retrieved December 5, 2013.
  110. Archived June 10, 2010, at the Wayback Machine.
  111. "Commercial Crew Development (CCDev) Round One Companies Have Reached Substantial Hardware Milestones In Only 9 Months, New Images and Data Show" (PDF). Commercialspaceflight.com. Archived from the original (PDF) on April 21, 2012. Retrieved December 5, 2013.
  112. "Blue Origin CCDev 2 Space Act Agreement" (PDF). Procurement.ksc.nasa.gov. Archived from the original (PDF) on February 15, 2013. Retrieved December 5, 2013.
  113. "NASA announces $1.1 billion in support for a trio of spaceships". Cosmicclog.nbcnews.com. Retrieved December 5, 2013.
  114. Matthews, Mark K. (August 18, 2013). "Musk, Bezos fight to win lease of iconic NASA launchpad". Orlando Sentinel. Retrieved August 21, 2013.
  115. 1 2 Messier, Doug (September 10, 2013). "Blue Origin Files Protest Over Lease on Pad 39A". Parabolic Arc. Retrieved September 11, 2013.
  116. Foust, Jeff (September 21, 2013). "A minor kerfuffle over LC-39A letters". Space Politics. Retrieved September 25, 2013.
  117. Messier, Doug (December 12, 2013). "Blue Origin Loses GAO Appeal Over Pad 39A Bid Process". Parabolic Arc. Retrieved December 13, 2013.
  118. Dean, James (April 15, 2014). "With nod to history, SpaceX gets launch pad 39A OK". Florida Today. Retrieved September 16, 2014.
  119. "XS-1 Program to Ease Access to Space Enters Phase 2". Defense Advanced Research Projects Agency. Retrieved May 16, 2016.
  120. "Bezos rocket engine selected for new Vulcan rocket – Spaceflight Now". spaceflightnow.com. Retrieved 2018-09-28.

Coordinates: 47°24′37″N 122°14′15″W / 47.41028°N 122.23750°W / 47.41028; -122.23750

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.