Bhadla Solar Park

Bhadla Solar Park
Country India
Location Bhadla, Jodhpur district, Rajasthan
Coordinates 27°32′23″N 71°54′55″E / 27.5396685°N 71.9152528°E / 27.5396685; 71.9152528Coordinates: 27°32′23″N 71°54′55″E / 27.5396685°N 71.9152528°E / 27.5396685; 71.9152528
Status Operational
Commission date February 22, 2017
Solar field
Type Flat-panel PV
Site area 10,000 acres (40 km2)
Site resource 5.5-6.0 kWh/m2 per day[1]
Power generation
Units operational 1365 MW[2][3]
Units under const. 890 MW
Nameplate capacity 2,255 MW (planned)

Bhadla Solar Park is one of the largest solar parks in India[2] which is spread over a total area of 10,000 acres (40 km2) in Bhadla, Phalodi tehsil, Jodhpur district, Rajasthan, India. The park is proposed to have a capacity of 2,255 MW.[4] The park has witnessed one of the lowest bids for tariff of Rs 2.44 per kWh, which is lowest for solar in India so far.[5][6]. In September 2018 Acme Solar announced that it had commissioned India's cheapest solar power, 200 MW at Bhadla [7].

Location

Bhadla is a sandy, dry and arid region with an area of about 45 km2. located in the Jodhpur district of Rajasthan. Bhadla is about 200 km north of Jodhpur and about 320 km west of Jaipur. The region has been described as "almost unlivable" due its climate. Average temperatures in Bhadla hover between 46 and 48 degrees Celsius. Hot winds and sand storms occur frequently. The closest habitation to Bhadla is the village of Bap, located about 50 km away, and the closest urban area - a tehsil town called Phalodi - is 80 km away.[8]

Auctions

Phase I

In the first phase, the NTPC auctioned 420 MW of capacity split into 6 packages of 70 MW each. Finnish company Fortum quoted the lowest tariff of INR 4.34 / kWh. Rising Sun Energy Pvt Ltd and Solairedirect won 2 packages each quoting a price of INR 4.35 / kWh. Yarrow Infrastructure won the remaining package quoting a price of INR 4.36 / kWh.[9][10]

In December 2016, Solairedirect signed an agreement with Ecoppia, a PV panel cleaning solutions developer, to provide automated cleaning solutions to the project. Due to the park's location in a desert region, it is prone to dust storms.[11] Solairedirect secured a loan of 675 crore from IDBI Bank in February 2017 to help finance the project.[12]

Phase II

SECI auctioned 250 MW capacity in the second phase for which 27 firms submitted bids.[13]

Phase III

SECI auctioned 500 MW capacity in the third phase on 11 May 2017.[6]

SECI also actioned 500 MW for tariff of Rs 2.44 per kWh. SoftBank has been awarded 300 MW & ACME 200 MW. Entire 750 MW capacity is expected to be commissioned by July 2018.[6] ACME commissioned the 200 MW capacity in September 2018.[3]

Phase IV

SECI auctioned 250 MW capacity in the fourth phase on 9 May 2017.[6]

South Africa's Phelan Energy Group and Avaada Power were awarded 50 MW and 100 MW of capacity respectively. Their bids of 2.62 per kilowatt hour were the lowest tariffs for any solar power project in India. It was also lower than NTPC's average coal power tariff of 3.20 per kilowatt hour. SBG Cleantech, a consortium of Softbank Group, Airtel and Foxconn, was awarded the remaining 100 MW capacity at a rate of 2.63 per kWh.[14][15]

SECI tendered bids for the remaining 750 MW capacity in June 2017.[16] In this way entire solar park will be completed by December 2018 and with 2055 MW installed capacity, it will be the one of the world's largest solar park.

Commissioning

On 22 February 2017, NTPC announced that it had commissioned 115 MW capacity at the park.[17] An additional 45 MW capacity was commissioned on 8 March,[18][19] and 25 MW on 18 March.[20] NTPC announced the commissioning of 20 MW capacity at the park on 23 March,[21][22] and 55 MW on 25 March 2017,[23][24] taking the total commissioned capacity of the Bhadla park to 260 MW.[25].As of September 2018, 1365 MW have been commissioned.

See also

References

  1. "India Solar Resource - Global Horizontal Irradiance - Annual Average, by NREL, National Renewable Energy Laboratory".
  2. 1 2 "Solar power plants of 620 MW capacity get operational at Bhadla park". 19 January 2018. Retrieved 2 October 2018.
  3. 1 2 "ACME commissions 200 MW solar power plant at Bhadla". 22 September 2018. Retrieved 19 February 2018.
  4. "Bhadla solar park project". Project Reporter. 2016-01-01. Retrieved 2016-09-14.
  5. Aggarwal, Mayank (2017-05-12). "Solar power tariff falls further to Rs2.44 per unit". livemint.com/. Retrieved 2017-06-01.
  6. 1 2 3 4 "Result of e-RA for Bhadla Phase-III and Phase-IV Solar Park" (PDF). seci.gov.in. 12 May 2017.
  7. "Acme Solar Commissions India's Cheapest Solar Power Plant". Retrieved 29 September 2018.
  8. "Catching the sun at Bhadla solar park". The Indian Express. 18 June 2017. Retrieved 18 November 2017.
  9. "India solar power tariffs hit new low of Rs 4 per unit - Times of India". The Times of India. Retrieved 2017-03-20.
  10. Ramesh, M (2016-01-19). "Solar power tariff touches a new low of ₹4.34/unit". The Hindu Business Line. Retrieved 2017-03-20.
  11. "Ecoppia to provide cleaning solution for India's Bhadla Solar Park". PV-Tech. Retrieved 2017-03-20.
  12. www.ETEnergyworld.com. "IDFC bank lends Rs 675 Crore for Rajasthan solar project - ET EnergyWorld". ETEnergyworld.com. Retrieved 2017-03-20.
  13. "Solar power tariffs fall to new low of Rs2.62 per unit". Mint. 10 May 2017. Retrieved 11 May 2017.
  14. Kumar, V Rishi (10 May 2017). "Solar power tariff bid hits new low of Rs 2.62 per unit in Bhadla park in Rajasthan". The Hindu Business Line. Retrieved 11 May 2017.
  15. "Solar power tariff drops to all-time low of Rs 2.62 per unit". The Indian Express. 10 May 2017. Retrieved 11 May 2017.
  16. "SECI tenders another 750MW at record-luring Bhadla Solar Park". PV Tech. Retrieved 18 November 2017.
  17. "NTPC commissions 115 MW capacity at Bhadla solar project". www.moneycontrol.com. Retrieved 20 March 2017.
  18. "NTPC commissions 45 MW capacity at Rajasthan solar project". www.moneycontrol.com. Retrieved 20 March 2017.
  19. "NTPC commissions 45 MW of Bhadla solar plant - ET EnergyWorld". ETEnergyworld.com. Retrieved 20 March 2017.
  20. "NTPC modestly higher after company commissions new power projects". Sify. Retrieved 2017-03-23.
  21. "NTPC commissions 20 MW capacity at Bhadla solar project - The Economic Times". The Economic Times. Retrieved 2017-03-23.
  22. "Corporate Disclosure: Commissioning of 20 MW of Bhadla Solar Power Project" (PDF). Bombay Stock Exchange. Retrieved 23 March 2017.
  23. Editorial, Reuters. "BRIEF-NTPC's 260 MW capacity of Bhadla solar PV project declared on commercial operation". Reuters India. Retrieved 2017-04-12.
  24. "NTPC commissions 260 MW Bhadla solar project in Rajasthan | Latest News & Updates at Daily News & Analysis". dna. 2017-03-31. Retrieved 2017-04-12.
  25. PTI (2017-03-27). "NTPC commissions 55-MW solar project at Bhadla". The Hindu Business Line. Retrieved 2017-04-12.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.